Northern Lights completes field program at Yukon’s Pup project
The company reported seven drill holes and four trenches; trench samples returned copper, while drill assays remain pending.
Companies, foreign trade, exports, employment and the business agenda. Source-linked developments around the world. (Page 40 of 51)
The company reported seven drill holes and four trenches; trench samples returned copper, while drill assays remain pending.
The utility says its system handles about 2,500 guarantees a year, while reliance on physical guarantees has fallen 74%.
The company completed a second hole at 425.8 metres; visually observed copper remains unconfirmed by laboratory assays.
The option to earn up to 70% of the Ontario ground depends on exploration spending and share issuances.
An initial site visit found no barrier to safe re-entry, but a fuller engineering assessment is still required.
The proposed consideration is 3,555,000 Big Bear shares; the transfer remains conditional.
The company has posted construction-phase financial assurance and is advancing long-lead equipment procurement.
The Ocean Partners agreement could cover up to 100% of output during the first seven operating years.
The package includes a proposed non-binding C$300 million project facility and a C$10 million equity investment.
The private placement has not closed; part of the proceeds is intended for a 10,000-metre drill program in British Columbia.
The company said grab samples from earlier trenches indicate sporadic gold mineralization along a corridor of at least 135 metres.
The September 24 release covers assays from three additional holes at the Balrog and Tommy veins in British Columbia.