Business / WORLD

Copper One starts third drill hole at British Columbia’s Redonda project

The company completed a second hole at 425.8 metres; visually observed copper remains unconfirmed by laboratory assays.

Reading sizeSources ↓Share story ↗
Conceptual illustration of industry, engineering and logistics connections.Illustration
Symbolic illustration

Copper One Resources said on October 2 that drilling had begun on hole RED-26-03 at its Redonda copper-molybdenum project in British Columbia. The hole is planned to reach about 470 metres, within a broader 2,400-metre program.

The company said it completed RED-26-02 at 425.8 metres and noted previously reported visual copper observations in the core. Visual observations do not confirm mineral content or grade; the company said laboratory analysis is needed.

Data

Key figures

Depths of Redonda 2026 drill holes

Source-stated completed depth for RED-26-02 and planned depth for RED-26-03.

RED-26-02 completed depth
425.8 metres
2026-10-02 · Observed
RED-26-03 planned depth
≈470 metres
2026-10-02 · Target
Methodology

425.8 metres is the completed hole length. About 470 metres is planned; visual mineralization has not been confirmed by laboratory analysis.

Updated:

Structured coverage

Subjects and places

Subject proposals

Geographic references

Only source-provided geographic references are shown. Opening an external map is optional. Optional story maps use OpenStreetMap. Opening a map sends your IP address and this site’s address to the map provider; location data remains readable as text without loading the map.

  • Canada · Place role: Coverage · Place type: Country or area · Location precision: Regional
    Evidence
    • Explicit preserved editorial country/region; no city or national centroid inferredcopperone.com ↗
Taxonomy version: IPTC Media Topics 2026-Q2

Continue reading