Copper One starts third drill hole at British Columbia’s Redonda project
The company completed a second hole at 425.8 metres; visually observed copper remains unconfirmed by laboratory assays.
Event / data period: 2026-10-02
Published: · Updated:

Copper One Resources said on October 2 that drilling had begun on hole RED-26-03 at its Redonda copper-molybdenum project in British Columbia. The hole is planned to reach about 470 metres, within a broader 2,400-metre program.
The company said it completed RED-26-02 at 425.8 metres and noted previously reported visual copper observations in the core. Visual observations do not confirm mineral content or grade; the company said laboratory analysis is needed.
Data
Depths of Redonda 2026 drill holes
Source-stated completed depth for RED-26-02 and planned depth for RED-26-03.
- RED-26-02 completed depth
- 425.8 metres
- 2026-10-02 · Observed
- RED-26-03 planned depth
- ≈470 metres
- 2026-10-02 · Target
Methodology
425.8 metres is the completed hole length. About 470 metres is planned; visual mineralization has not been confirmed by laboratory analysis.
Updated:
Subjects and places
Subject proposals
- Business enterpriseSuggested
- Preserved editorial category/topic; broad candidate onlycopperone.com ↗
Geographic references
Only source-provided geographic references are shown. Opening an external map is optional. Optional story maps use OpenStreetMap. Opening a map sends your IP address and this site’s address to the map provider; location data remains readable as text without loading the map.
- Canada · Place role: Coverage · Place type: Country or area · Location precision: RegionalEvidence
- Explicit preserved editorial country/region; no city or national centroid inferredcopperone.com ↗