Business / WORLD

DEWA says digital guarantee system cuts processing time by 95%

The utility says its system handles about 2,500 guarantees a year, while reliance on physical guarantees has fallen 74%.

Reading sizeSources ↓Share story ↗
Conceptual illustration of industry, engineering and logistics connections.Illustration
Symbolic illustration

Dubai Electricity and Water Authority (DEWA) said on October 3 that its Smart Bank Guarantee System has cut transaction turnaround time by 95% and reduced reliance on physical bank guarantees by 74%. The system manages the guarantee lifecycle through digital processing, verification and tracking.

DEWA said the platform processes approximately 2,500 guarantees annually, with a total value of around AED1 billion. The authority described the changes as system performance results; its announcement did not specify the measurement period or provide a comparison baseline for the two percentage reductions.

Data

Key figures

DEWA bank guarantee system results

Annual transaction volume and performance changes reported by DEWA on 3 October 2026.

Bank guarantees processed annually
≈2,500 bank guarantees per year
2026-10-03 · Observed
Annual value of guarantees processed
≈1,000,000,000 AED
2026-10-03 · Observed
Transaction turnaround time reduction
95 percent
2026-10-03 · Observed
Reduction in reliance on physical guarantees
74 percent
2026-10-03 · Observed
Methodology

Values are taken from DEWA’s statement as reported by WAM; the source’s approximate qualifiers are retained.

Updated:

Structured coverage

Subjects and places

Subject proposals

Geographic references

Only source-provided geographic references are shown. Opening an external map is optional. Optional story maps use OpenStreetMap. Opening a map sends your IP address and this site’s address to the map provider; location data remains readable as text without loading the map.

Taxonomy version: IPTC Media Topics 2026-Q2

Continue reading

Business

UAE ministry to present industrial support programmes at ADNOC forum

MoIAT says the 25 October forum will explain how manufacturers can use four existing programmes for procurement, finance and technology support; the announcement does not promise new awards.

Emirates News Agency (WAM)3 min read Data included
Business

UAE to support investor behind planned aluminium-anode plant

The Ministry of Investment signed an MoU with Sunstone Development to support a UAE facility; an earlier joint-venture plan envisaged about US$300 million in investment.

Emirates News Agency (WAM)1 min read Data included