Government, statistics and finance representatives at the forum called for the value of forests, water, land, minerals and biodiversity to feature more in economic decisions.
African Development Bank Group1 min read Data included
Anglo American said copper production across its operations fell 5% year on year to 174,900 tonnes in the quarter ended 30 September 2026. The company attributed the decline to severe winter weather in Chile and the use of lower-grade stockpile ore at Collahuasi.
A joint AfDB–Islamic Development Bank mission examined the southern rail corridor, which is intended to connect agricultural, mineral and industrial goods with markets.
African Development Bank Group1 min read Data included
ABB reported third-quarter 2026 orders of $12.055 billion on 20 October, up 40% year on year. Revenue increased 14% to $9.701 billion, while operational EBITA rose 24% to $2.026 billion.
White Gold reported first assays from its 2026 drilling at the Golden Saddle and VG deposits in Yukon. Results included 1.47 g/t gold over 38.08 metres, including 5.13 g/t over 7.88 metres at Golden Saddle, and 2.53 g/t over 18.90 metres at VG.
White Gold Corp. via Newsfile Corp.1 min read Data included
The Valencian government imposed temporary mobility restrictions on the southern Valencia and northern Alicante coastal belts on October 19 amid heavy rain and flood risks from DANA Adam. The order provides exemptions for essential services.
Diari Oficial de la Generalitat Valenciana1 min read Data included
Springer’s indicated rare earth resource in Ontario rose 116% to 122.4 million tonnes. A first supplementary gallium estimate reports in-situ content, but assigns gallium no economic value.
Volta Metals Ltd. via TMX Newsfile1 min read Data included
Spain’s energy directorate granted a public-utility declaration for the 39.93 MW Vega Solar photovoltaic plant and evacuation infrastructure spanning Guadalajara and Madrid provinces. The decision was published in the BOE on 19 October.
Boletín Oficial del Estado (BOE)1 min read Data included
The Official Gazette published on 2026-10-20 an administrative prior and construction authorization for the Hibridación Los Belos battery storage module in La Muela and Muel, Zaragoza. Its installed power is 26.74 MW, and it is to be hybridized with an existing solar facility.
Boletín Oficial del Estado (BOE)1 min read Data included
The decision rejected the permit application for the Los Campillos project, which had a proposed installed power of 33.825 MW. It was published in the BOE on 2026-10-20.
Boletín Oficial del Estado (BOE)1 min read Data included