Inomin reports 420 metres of nickel-bearing core at Beaver-Lynx
First-pass drilling at a previously untested British Columbia block returned a long nickel-magnesium interval; five additional holes await assays.
Explore the Newsverum news archive, editorial policies and categories in Turkish and English, with Arabic, French, Spanish, German and Portuguese editions. (Page 357 of 436)
First-pass drilling at a previously untested British Columbia block returned a long nickel-magnesium interval; five additional holes await assays.
The Beluga-Healy project is expected to add a second high-voltage route across Alaska’s Railbelt, with total planned investment of $418 million.
The proposal includes trenching at seven anomalies and closer-spaced soil sampling at five target areas.
The British Columbia developer says its Premier mill work and Red Mountain access-road construction are progressing, with major mine permits still ahead.
The airborne survey launched on October 5 aims to increase geoscientific coverage from 22.27% to 46.1%, rather than measure the area containing deposits.
The commission’s 5 October list includes schedules for ten electricity distributors.
The company reported seven drill holes and four trenches; trench samples returned copper, while drill assays remain pending.
The enlarged best-efforts placement announced on October 5 remains subject to regulatory approvals and a planned closing.
Six first-pass holes totaling 2,172 metres at the Ontario project returned broad gold-bearing core intervals, with true widths yet to be established.
The utility says its system handles about 2,500 guarantees a year, while reliance on physical guarantees has fallen 74%.
The company completed a second hole at 425.8 metres; visually observed copper remains unconfirmed by laboratory assays.
Kenorland issued 45,794 shares to the two investors and reported gross proceeds of $114,393.41.