Azincourt reports initial uranium drilling results at Snegamook
Two holes returned radiometric eU3O8 equivalent values; these are not chemical assay grades, and no current resource estimate exists for the property.
Explore the Newsverum news archive, editorial policies and categories in Turkish and English, with Arabic, French, Spanish, German and Portuguese editions. (Page 274 of 436)
Two holes returned radiometric eU3O8 equivalent values; these are not chemical assay grades, and no current resource estimate exists for the property.
Rio Grande do Sul’s agriculture department said 127 farms in 35 municipalities received permission to plant soybeans early on a total of 20,462.8 hectares for the 2026/27 season. Planting could begin September 15; early-planted areas are outside Proagro coverage.
Rio Grande do Sul’s agriculture department created a sectoral advisory council for oilseeds and biodiesel on October 14. It will address policy, research and bottlenecks across production, processing and trade; Seapi now coordinates 24 sectoral councils.
The model chooses among supplied options rather than generating prose; its developer reported 90.7% accuracy on 4,454 test examples.
The company outlined sequencing for Archimedes, Lone Tree and Mineral Point; its 2028 production range is a target.
The plan would separate its Appalachian gas production and gathering business into a public company, with completion expected in the second half of 2027.
The company summarized soil sampling and geophysical work at Horse Mountain, Mill Creek and Lewis; findings are for target generation.
The works include a 225 kV underground link, a 400 kV overhead line and a new substation.
Four holes returned gold, silver and, in some intervals, copper and molybdenum; reported lengths are drill intercepts and true widths remain undetermined.
The ministry opened a 20-day consultation on two draft rules for developing models used in power planning, operations and short-term pricing.
Sectionalizing the first Campos–GNA circuit began integration of EDF’s Açu Transmissora asset into Brazil’s national grid.
The company signed a non-binding joint-venture letter of intent with an unnamed partner; output figures are proposed full-capacity targets.