DR Congo discussion links infrastructure standards with testing capacity
A metrology association leader said standards need testing and conformity-assessment systems to support their use.
Congo - Kinshasa: source-linked stories on projects, data and official announcements. A story is listed when its record names the country; locations are never inferred. (Page 2 of 3)
A metrology association leader said standards need testing and conformity-assessment systems to support their use.
ACGT said the southeast and southwest ring roads remain closed to traffic and unauthorized motor vehicles may not enter work areas.
The National Service facility processes maize from agricultural sites in Kaniama Kasese and Lovo.
Ituri’s roads office and contractor began earthworks on the new phase; the project also includes six bridges.
The ministry formally installed the appointed leaders of the public water-service regulatory authority.
Tefen and the committee overseeing Kinshasa’s expansion project signed a partnership for studies and support to find financing partners for a planned new city on 1,000 hectares in Maluku. ACP reported the signing on October 10.
National Medical Order president Berthier Nsadi urged doctors at a Kinshasa conference on October 10 to use AI within the principles of autonomy, beneficence, non-maleficence and equity.
The energy ministers of the Democratic Republic of the Congo and the Republic of the Congo discussed reviving a proposed link between Pointe-Noire, Brazzaville, Kinshasa and Inga in Kinshasa on October 9. ACP reported their post-meeting communiqué.
The Economy Ministry said three strategy documents on formalising the informal economy were approved with amendments by consensus at a technical workshop in Kinshasa on October 8. ACP published its report on October 10.
Critical Metals said it had begun its 2026 field programme at the Molulu project in the Democratic Republic of the Congo. The work includes mapping, trenching and sampling to assess an initial target.
Ivanhoe Mines reported 76,401 tonnes of copper in saleable products from Kamoa-Kakula and record zinc-in-concentrate output of 77,147 tonnes at Kipushi in the third quarter of 2026. The figures are company-reported mine results, not national production totals.
The airborne survey launched on October 5 aims to increase geoscientific coverage from 22.27% to 46.1%, rather than measure the area containing deposits.