DR Congo and Republic of Congo revisit Pointe-Noire–Inga power link
The energy ministers of the Democratic Republic of the Congo and the Republic of the Congo discussed reviving a proposed link between Pointe-Noire, Brazzaville, Kinshasa and Inga in Kinshasa on October 9. ACP reported their post-meeting communiqué.
Event / data period: 2026-10-09
Published: · Updated:

The ministers agreed to accelerate bilateral follow-up, update technical studies and mobilise the financing needed. They also discussed progress on the Pioka-Tombe hydropower project.
The communiqué says work and financing efforts remain in progress. It announces no construction contract, secured financing, capacity, budget or commissioning date.
Data
Meeting topics
Project topics reported after the meeting.
- · Occurred
Interconnection and Pioka-Tombe talks
Updating studies, follow-up and financing efforts; also hydropower project progress.
Methodology
Based on the bilateral communiqué as reported by ACP; delivery and financing are not confirmed.
Updated:
Subjects and places
Subject proposals
- Energy and resourceSuggested
- Preserved editorial category/topic; broad candidate onlyacp.cd ↗
Geographic references
Only source-provided geographic references are shown. Opening an external map is optional. Optional story maps use OpenStreetMap. Opening a map sends your IP address and this site’s address to the map provider; location data remains readable as text without loading the map.
- Congo - Kinshasa · Place role: Coverage · Place type: Country or area · Location precision: RegionalEvidence
- Explicit preserved editorial country/region; no city or national centroid inferredacp.cd ↗