A Coruña outer port opens consultation on a proposed storage facility
Maritime Global Services applied for a concession to build a warehouse for port equipment; the notice does not grant it.
Article subject labels can be suggestions and are not editorial confirmation.
Maritime Global Services applied for a concession to build a warehouse for port equipment; the notice does not grant it.
The estimated value is €1,734,251.14 excluding VAT, with a 16-month contract duration.
The road authority estimates the contract at €644,765.93 excluding VAT, with a three-month duration.
The tender has an estimated value of €9,856,725.72 excluding VAT and a planned duration of 33 months.
The Official Gazette published on 2026-10-19 an administrative prior and construction authorization for the Tesouro Storage battery storage module in As Pontes de García Rodríguez, A Coruña. Its installed power is 17.5 MW, and it is to be hybridized with an existing wind facility.
The two-day 6G MENA conference addressed AI-native networks, spectrum and network integration.
The BOE published on 17 October ADIF’s third amendment and extension to its agreement with Extremadura and Mérida for a pedestrian-cycle bridge over the station tracks.
The Renewed Hope Initiative launched its food outreach programme in Katsina State on October 17.
Catalonia’s territorial services in Girona opened public review of a public-utility application for the planned 5 MW PS el Pla solar plant in Llagostera and its underground evacuation lines. The BOE notice appeared on 20 October.
MEWA said the agricultural sector grew 5% in 2025 and aquaculture output approached 200,000 tonnes.
ADIF awarded the contract to Baobab Soluciones SL for technical assistance to optimize its warehouse structure. The formalization notice was published in the BOE on 20 October.
Samples from the Jake target contained relict chalcopyrite and silver-bearing minerals, which the company interprets as support for its exploration model.