NEWSVERUM / Data desk

Products and services

IPTC Media Topics 2026-Q2 · IPTC · CC BY 4.0

Article subject labels can be suggestions and are not editorial confirmation.

Related subjects

Energy

San Serván battery hybrid proposal enters 15-business-day public review

Spain’s government delegation in Extremadura opened public review of an application for a battery system to hybridize the existing 43.2 MW FV San Serván 2020 solar plant in Mérida. The notice appeared in the BOE on 20 October.

Boletín Oficial del Estado (BOE)1 min read Data included
Energy

Spain authorizes Solaria-Santiz I battery hybrid project in Valdelosa, Salamanca

The Official Gazette published on 2026-10-20 an administrative prior and construction authorization for the Solaria-Santiz I battery storage module in Valdelosa, Salamanca. Its installed power is 19.993 MW, and it is to be hybridized with an existing solar facility.

Boletín Oficial del Estado (BOE)1 min read Data included
Infrastructure

Spain formalizes Northwest road-safety inspection contract

Spain’s roads directorate formalized the Northwest lot of a multi-lot contract for principal safety inspections on the State Highway Network. The notice was published in the BOE on 20 October.

Boletín Oficial del Estado (BOE)1 min read Data included
Energy

Spain authorizes Hibridación Los Arcos battery hybrid project in Andorra, Teruel

The Official Gazette published on 2026-10-19 an administrative prior and construction authorization for the Hibridación Los Arcos battery storage module in Andorra, Teruel. Its installed power is 26.74 MW, and it is to be hybridized with an existing solar facility.

Boletín Oficial del Estado (BOE)1 min read Data included
Business

McFarlane outlines planned 50,000-metre Phase 2 drilling at Juby

McFarlane said it plans 50,000 metres of drilling over 12–15 months at its Juby gold project in Ontario and that the program is fully funded. It expects three rigs to be operating before November 1.

McFarlane Lake Mining via GlobeNewswire1 min read Data included
Infrastructure

Méndez Álvaro station design agreement extended by three years

The BOE published on 19 October an amendment to the agreement between ADIF and Metro de Madrid to prepare a joint construction design for remodelling the Méndez Álvaro rail stations.

Boletín Oficial del Estado (BOE)1 min read Data included
Energy

Spain accepted the withdrawal of the application for Mistral

The decision accepted the withdrawal of the application for the Mistral project, which had a proposed installed power of 106.4 MW. It was published in the BOE on 2026-10-19.

Boletín Oficial del Estado (BOE)1 min read Data included