San Serván battery hybrid proposal enters 15-business-day public review
Spain’s government delegation in Extremadura opened public review of an application for a battery system to hybridize the existing 43.2 MW FV San Serván 2020 solar plant in Mérida. The notice appeared in the BOE on 20 October.
Event / data period: 2026-10-20
Published: · Updated:

The application describes a 40 MW nominal system with 160 MWh of storage capacity and a project budget of €17,417,050. Interested parties may submit comments within 15 business days.
This is a public review of applications for prior and construction authorization; it does not mean approval has been granted or the facility built.
Data
Source and measure
Project information stated in the official source.
| Application review period: 15 business days | 15 |
Methodology
The source gives a 15-business-day period; no closing date has been calculated.
Updated:
Installed capacity stated in application
Power figures for the existing plant and proposed battery module.
| Existing solar plant power | 43.2 |
| Proposed battery system power | 40 |
Methodology
Figures transcribed from the application; they do not indicate approval or commissioning.
Updated:
Subjects and places
Subject proposals
- Solar powerSuggested
- Subject suggested from the title or summary: solarwww.boe.es ↗
Geographic references
Only source-provided geographic references are shown. Opening an external map is optional. Optional story maps use OpenStreetMap. Opening a map sends your IP address and this site’s address to the map provider; location data remains readable as text without loading the map.
- Spain · Place role: Coverage · Place type: Country or area · Location precision: RegionalEvidence
- Explicit preserved editorial country/region; no city or national centroid inferredwww.boe.es ↗