Public-utility application opens for 5 MW PS el Pla solar project
Catalonia’s territorial services in Girona opened public review of a public-utility application for the planned 5 MW PS el Pla solar plant in Llagostera and its underground evacuation lines. The BOE notice appeared on 20 October.
Event / data period: 2026-07-20
Published: · Updated:

The application concerns land in Llagostera and Cassà de la Selva and underground 25 kV lines. The notice does not grant public-utility status; it publishes the request for review.
The procedure concerns land rights for a project filed under a 2023 case reference; it is not a report that the plant has been built.
Data
Source and measure
Project information stated in the official source.
| Installed capacity | 5 |
Methodology
Capacity stated in the application; it is not an approval or completed facility.
Updated:
Subjects and places
Subject proposals
- Solar powerSuggested
- Subject suggested from the title or summary: solarwww.boe.es ↗
Geographic references
Only source-provided geographic references are shown. Opening an external map is optional. Optional story maps use OpenStreetMap. Opening a map sends your IP address and this site’s address to the map provider; location data remains readable as text without loading the map.
- Spain · Place role: Coverage · Place type: Country or area · Location precision: RegionalEvidence
- Explicit preserved editorial country/region; no city or national centroid inferredwww.boe.es ↗