Catalonia opens public review of proposed 5.5 MW Centelles battery facility
Catalonia’s energy directorate published a public notice on 20 October for the proposed 5.5 MW PHFV Centelles battery storage facility.
Event / data period: 2026-10-20
Published: · Updated:

The application covers an energy storage facility in Centelles, Osona, and an underground 25 kV connection line. This is an application and public-comment stage, not a construction permit.
The notice gives a project budget of €2,079,409.45 and a 30-day period for submissions beginning the day after publication.
Data
Project figure in decision
Project value stated in the official decision.
| Proposed installed power | 5.5 |
Methodology
Value transcribed from the source; it must not be read as realized generation or completed construction.
Updated:
Subjects and places
Subject proposals
- Energy and resourceSuggested
- Preserved editorial category/topic; broad candidate onlywww.boe.es ↗
- ElectricitySuggested
- Subject suggested from the title or summary: battery facilitywww.boe.es ↗
Geographic references
Only source-provided geographic references are shown. Opening an external map is optional. Optional story maps use OpenStreetMap. Opening a map sends your IP address and this site’s address to the map provider; location data remains readable as text without loading the map.
- Spain · Place role: Coverage · Place type: Country or area · Location precision: RegionalEvidence
- Explicit preserved editorial country/region; no city or national centroid inferredwww.boe.es ↗