Energy / WORLD

Catalonia opens public review of proposed 5.5 MW Centelles battery facility

Catalonia’s energy directorate published a public notice on 20 October for the proposed 5.5 MW PHFV Centelles battery storage facility.

Reading sizeSources ↓Share story ↗
Conceptual illustration of electricity generation, storage and connected data.Illustration
Symbolic illustration

The application covers an energy storage facility in Centelles, Osona, and an underground 25 kV connection line. This is an application and public-comment stage, not a construction permit.

The notice gives a project budget of €2,079,409.45 and a 30-day period for submissions beginning the day after publication.

Data

Table

Project figure in decision

Project value stated in the official decision.

Proposed installed power5.5
Methodology

Value transcribed from the source; it must not be read as realized generation or completed construction.

Updated:

Structured coverage

Subjects and places

Subject proposals

Geographic references

Only source-provided geographic references are shown. Opening an external map is optional. Optional story maps use OpenStreetMap. Opening a map sends your IP address and this site’s address to the map provider; location data remains readable as text without loading the map.

  • Spain · Place role: Coverage · Place type: Country or area · Location precision: Regional
    Evidence
    • Explicit preserved editorial country/region; no city or national centroid inferredwww.boe.es ↗
Taxonomy version: IPTC Media Topics 2026-Q2

Continue reading

Energy

Public-utility application opens for 5 MW PS el Pla solar project

Catalonia’s territorial services in Girona opened public review of a public-utility application for the planned 5 MW PS el Pla solar plant in Llagostera and its underground evacuation lines. The BOE notice appeared on 20 October.

Boletín Oficial del Estado (BOE)1 min read Data included
Energy

San Serván battery hybrid proposal enters 15-business-day public review

Spain’s government delegation in Extremadura opened public review of an application for a battery system to hybridize the existing 43.2 MW FV San Serván 2020 solar plant in Mérida. The notice appeared in the BOE on 20 October.

Boletín Oficial del Estado (BOE)1 min read Data included