AfDB discusses trade-finance access with Rwandan commercial banks
At a Kigali meeting, AfDB and Rwandan banks discussed business access to import and export finance and regional trade.
Follow global economy, business, finance, energy, climate and public affairs through original sources, sourced data and context. (Page 64 of 300)
At a Kigali meeting, AfDB and Rwandan banks discussed business access to import and export finance and regional trade.
The facility aims to widen Kenyan businesses’ access to financing for eligible import and export transactions.
Anglo American said copper production across its operations fell 5% year on year to 174,900 tonnes in the quarter ended 30 September 2026. The company attributed the decline to severe winter weather in Chile and the use of lower-grade stockpile ore at Collahuasi.
A joint AfDB–Islamic Development Bank mission examined the southern rail corridor, which is intended to connect agricultural, mineral and industrial goods with markets.
ABB reported third-quarter 2026 orders of $12.055 billion on 20 October, up 40% year on year. Revenue increased 14% to $9.701 billion, while operational EBITA rose 24% to $2.026 billion.
White Gold reported first assays from its 2026 drilling at the Golden Saddle and VG deposits in Yukon. Results included 1.47 g/t gold over 38.08 metres, including 5.13 g/t over 7.88 metres at Golden Saddle, and 2.53 g/t over 18.90 metres at VG.
The Valencian government imposed temporary mobility restrictions on the southern Valencia and northern Alicante coastal belts on October 19 amid heavy rain and flood risks from DANA Adam. The order provides exemptions for essential services.
Springer’s indicated rare earth resource in Ontario rose 116% to 122.4 million tonnes. A first supplementary gallium estimate reports in-situ content, but assigns gallium no economic value.
Spain’s energy directorate granted a public-utility declaration for the 39.93 MW Vega Solar photovoltaic plant and evacuation infrastructure spanning Guadalajara and Madrid provinces. The decision was published in the BOE on 19 October.
The Official Gazette published on 2026-10-20 an administrative prior and construction authorization for the Hibridación Los Belos battery storage module in La Muela and Muel, Zaragoza. Its installed power is 26.74 MW, and it is to be hybridized with an existing solar facility.
The decision rejected the permit application for the Los Campillos project, which had a proposed installed power of 33.825 MW. It was published in the BOE on 2026-10-20.
Metals Creek said a rig is being mobilized for additional drilling at the Ogden project near Timmins. The planned program comprises four diamond holes targeting the Thomas Ogden Zone fold structure.