Energy / WORLD

ANP completes fuel-data agreement with 22 states and the Federal District

Signatures were completed on 7 October; access to electronic tax documents still requires authorization and a new rule.

Reading sizeSources ↓Share story ↗
Conceptual illustration of electricity generation, storage and connected data.Illustration
Symbolic illustration

According to Click Petróleo e Gás’s 10 October report, which cites ANP’s 9 October release, signature collection for ACT 17/2026 between ANP and finance authorities in 22 states and the Federal District was completed on 7 October. The ten-year agreement allows access to electronic tax documents for regulated fuel-market participants that authorize it.

The agreement is the first of three fronts for ANP’s PISTA fuel-supply oversight platform. ANP expects to open public consultation on a draft rule in November 2026 and publish the rule by March 2027. Systems for receiving and processing the data are also being developed; the agreement alone does not require companies to authorize access. São Paulo, Paraná, Santa Catarina and Amazonas are absent from the signatory list.

Data

Table

ANP’s PISTA implementation status

Agreement, access and timetable details confirmed in the official ANP release.

Acordo de cooperação concluído em 7/10; dez anos de vigência; acesso depende da autorização dos agentes.Cooperation agreement completed on 7 October; ten-year term; access depends on regulated parties’ authorization.اكتمل اتفاق التعاون في 7 أكتوبر ومدته عشر سنوات؛ ويعتمد الوصول على إذن الجهات المنظمة.Accord achevé le 7 octobre, valable dix ans ; l’accès dépend de l’autorisation des acteurs réglementés.Acuerdo completado el 7 de octubre, con vigencia de diez años; el acceso depende de la autorización de los agentes regulados.Vereinbarung am 7. Oktober abgeschlossen, Laufzeit zehn Jahre; Zugriff setzt die Zustimmung der regulierten Akteure voraus.Acordo concluído em 7 de outubro, válido por dez anos; o acesso depende da autorização dos agentes regulados.
İstişare Kasım 2026 için, kural Mart 2027’ye kadar öngörülüyor; sistem geliştirme sürüyor.Consultation is planned for November 2026, the rule by March 2027; system development continues.المشاورة متوقعة في نوفمبر 2026 والقاعدة بحلول مارس 2027؛ وتطوير الأنظمة مستمر.Consultation prévue en novembre 2026 et règle d’ici mars 2027 ; les systèmes sont encore en développement.Consulta prevista para noviembre de 2026 y norma antes de marzo de 2027; los sistemas siguen en desarrollo.Konsultation für November 2026, Regelung bis März 2027 vorgesehen; Systeme noch in Entwicklung.Consulta prevista para novembro de 2026 e regra até março de 2027; os sistemas continuam em desenvolvimento.
Methodology

Summarizes implementation status and the forward regulatory timetable in ANP’s 9 October release; the agreement does not mean data access is already operating or the system is complete.

Updated:

Structured coverage

Subjects and places

Subject proposals

Geographic references

Only source-provided geographic references are shown. Opening an external map is optional. Optional story maps use OpenStreetMap. Opening a map sends your IP address and this site’s address to the map provider; location data remains readable as text without loading the map.

  • Brazil · Place role: Coverage · Place type: Country or area · Location precision: Regional
    Evidence
Taxonomy version: IPTC Media Topics 2026-Q2

Continue reading