GE Vernova to supply seven turbines for Eurus Energy in Japan
Hiyamizutouge’s planned wind capacity is 29.4 MW.
Follow global economy, business, finance, energy, climate and public affairs through original sources, sourced data and context.
Hiyamizutouge’s planned wind capacity is 29.4 MW.
DEWA’s announcement concerns the fourth phase of Dubai’s solar park.
The energy minister said the target, covering nuclear and renewable power, has been raised to 35% for 2030–2031.
Data includedKuwait’s peak electricity load reached 17,540 MW in summer 2026, below last year’s high despite additional loads joining the grid.
Data includedUNFCCC Executive Secretary Simon Stiell told the European Parliament that one study estimated the summer’s extreme-weather costs at €180 billion.
Data includedControl-center visit examines operating and monitoring requirements.
The Scottish wind project includes a 20-year service agreement.
The September 11 release describes potential investment exceeding €5 billion.
An official gazette published on 1 October gives Wing Wah a renewable five-year road-transport licence.
Data includedSkyNRG said on 28 September 2026 it selected Technip Energies, Sasol and Topsoe for initial engineering in the FEED phase of Project Wigeon, a planned sustainable aviation fuel facility at the Port of Walla Walla, Washington.
Data includedGeorgia Power said on 15 September 2026 that its 128 MW Robins Battery Facility near Warner Robins, Georgia, reached commercial operation, with Burns & McDonnell as EPC contractor delivering the project on schedule.
Data includedAECOM said the Santa Clara Valley Water District selected it to provide design services for the Pure Water Silicon Valley demonstration facility, a pilot able to produce up to 200 gallons per minute.
Data included