Naturgy receives construction permit for El Almendro hybrid solar module
The BOE published on 20 October a construction authorization for Naturgy Renovables’ 36 MW solar module at El Almendro, Huelva, to be hybridized with an existing wind farm.
Event / data period: 2026-10-20
Published: · Updated:

The authorization covers construction of the new photovoltaic module and underground 30 kV evacuation lines. It permits installation but does not report that the facility is complete.
The decision lists the existing PE El Almendro wind farm at 43.35 MW and the solar module at 36 MW. These are power ratings, not energy output.
Data
Project figure in decision
Project value stated in the official decision.
| Solar module installed power | 36 |
Methodology
Value transcribed from the source; it must not be read as realized generation or completed construction.
Updated:
Subjects and places
Subject proposals
- Wind powerSuggested
- Subject suggested from the title or summary: wind farmwww.boe.es ↗
- Solar powerSuggested
- Subject suggested from the title or summary: solarwww.boe.es ↗
- Construction and propertySuggested
- Subject suggested from the title or summary: constructionwww.boe.es ↗
Geographic references
Only source-provided geographic references are shown. Opening an external map is optional. Optional story maps use OpenStreetMap. Opening a map sends your IP address and this site’s address to the map provider; location data remains readable as text without loading the map.
- Spain · Place role: Coverage · Place type: Country or area · Location precision: RegionalEvidence
- Explicit preserved editorial country/region; no city or national centroid inferredwww.boe.es ↗