Source-grounded global reporting on international affairs, politics, public institutions, safety, business, economics, science, environment and infrastructure. (Page 186 of 430)
PLS said on 15 October that Pilgangoora’s Ore Reserve had reached 249.2 million tonnes. At a grade of 1.24% lithium oxide, this represents about 3.1 million tonnes of contained lithium oxide; contained lithium oxide increased 31% against the previous reserve estimate.
Thailand’s government, Microsoft and partner organisations announced the Microsoft Elevate AI and Jobs for Thailand coalition on 15 October. Its first phase is planned to run for about nine months, from October 2026 through June 2027.
The European Investment Bank will lend €20 million to Tauragė municipality in western Lithuania for planned sustainable mobility, energy-efficiency, renewable-energy and public-infrastructure projects.
Preliminary Statistics Poland data show domestic construction and assembly output, measured at constant prices, fell 9% year on year in September 2026. It rose 3% from August.
Preliminary Statistics Poland data show prices of construction and assembly production rose 6.9% in September 2026 from a year earlier and 0.7% from August.
Sold industrial production in Poland was 4.6% higher in September 2026 than a year earlier, Statistics Poland reported. It rose 17.0% compared with August.
Preliminary data from Statistics Poland show prices of sold industrial production rose 6.1% in September 2026 from a year earlier. Prices increased 0.7% compared with the previous month.