NEWSVERUM / Data desk

Health facility

IPTC Media Topics 2026-Q2 · IPTC · CC BY 4.0

Article subject labels can be suggestions and are not editorial confirmation.

Related subjects

Health

England sets out patient-safety actions after Thirlwall inquiry

The English government announced initial measures on neonatal safety, safeguarding and accountability following the Thirlwall Inquiry into Countess of Chester Hospital.

UK Department of Health and Social Care1 min read Data included
Infrastructure

EllisDon selected to design and build CSC health centre in Dorchester, N.B.

On 29 September 2026 the Government of Canada selected EllisDon to design and build the Correctional Service of Canada’s 155-bed Health Centre of Excellence in Dorchester, New Brunswick, with a C$58.7 million design-phase contract.

Correctional Service of Canada via Newswire.ca2 min read Data included
Infrastructure

Maharat Al Injaz signs structural works contract for SMC3 hospital in Riyadh

SMC Healthcare signed a SAR 148,447,428.50 contract, excluding VAT, with Maharat Al Injaz on 27 September 2026 for foundation, construction and structural works at the planned 296-bed SMC3 Hospital in Riyadh.

Specialized Medical Company (SMC Healthcare) via Saudi Exchange2 min read Data included
Infrastructure

BEC Arabia signs mechanical and electrical works contract for Al Khobar hospital

Almoosa Health signed a SAR 781,656,783 contract, excluding VAT, with BEC Arabia Contracting Company on 21 September 2026 for mechanical and electrical works at the Almoosa Specialized Hospital in Al Khobar, due within 24 months.

Almoosa Health Company via Saudi Exchange1 min read Data included