Canada reported 41.7 thousand tonnes of recoverable copper in August
Refined copper was 27.4 thousand tonnes and recoverable cobalt 537.8 tonnes in the same month.
Follow global economy, business, finance, energy, climate and public affairs through original sources, sourced data and context. (Page 87 of 316)
Refined copper was 27.4 thousand tonnes and recoverable cobalt 537.8 tonnes in the same month.
The seasonally adjusted transport index was 92.4; both indexes use January 2018=100.
Hydraulic capacity was 83.0 GW, with wind at 18.4 GW and solar at 5.7 GW.
Revenue slipped to C$23.9 billion as the operating profit margin narrowed to 3.8%.
There were 67,900 vacancies in health occupations in 2025, and their vacancy rate remained above the national rate.
Exports rose to C$28.4 billion and imports to C$39.6 billion, with both flows increasing year over year.
The first national DXA findings classified 13% as diagnosed with or showing indications of osteoporosis and 39% as having low bone mass.
ADIF has published a tender for its Acerca service assisting people with disabilities and people with reduced mobility, according to a BOE notice dated 20 October.
A tender published by ADIF in the BOE on 20 October covers rehabilitation of the high-voltage power supply line serving signalling and telecommunications installations on the Arenys–Maçanet section.
The tender covers supply and transport of track equipment to connect the Astigarraga–Irún section with Irún station. The notice was published in the BOE on 20 October.
ADIF published a tender to direct works on fixed and mobile signalling and telecommunications changes tied to projects at Aigües junction, the Vallbona bypass and the Montcada i Reixac underground section.
ADIF awarded a contract to protect the train parking area at Barcelona’s França station, according to a BOE notice published on 20 October.