Méndez Álvaro station design agreement extended by three years
The BOE published on 19 October an amendment to the agreement between ADIF and Metro de Madrid to prepare a joint construction design for remodelling the Méndez Álvaro rail stations.
Source-grounded global reporting on international affairs, politics, public institutions, safety, business, economics, science, environment and infrastructure. (Page 202 of 430)
The BOE published on 19 October an amendment to the agreement between ADIF and Metro de Madrid to prepare a joint construction design for remodelling the Méndez Álvaro rail stations.
The decision accepted the withdrawal of the application for the Mistral project, which had a proposed installed power of 106.4 MW. It was published in the BOE on 2026-10-19.
Osiris One Metals signed a definitive agreement to acquire an option over the Island Range project in British Columbia. The company said the transaction remains subject to closing conditions and exchange approval.
Renegade Gold reported surface channel and rock sampling results at BobJo in Ontario. Its leading highlighted channel interval graded 16.2 grams of gold per tonne over 5.0 metres.
Renforth reported nickel-cobalt and zinc-copper-silver mineralization in three holes at its Victoria deposit in Quebec. One interval measured 118 metres at 0.081% nickel.
Spain’s agriculture ministry published in the BOE on 19 October its approval of a normal amendment to the Rioja Protected Designation of Origin specification.
A two-week initiative with Imam Mohammad Ibn Saud Islamic University began on October 19.
The tender lists an estimated value of €401,148.21 excluding VAT and a planned six-month contract.
Maritime Global Services applied for a concession to build a warehouse for port equipment; the notice does not grant it.
The estimated value is €1,734,251.14 excluding VAT, with a 16-month contract duration.
The road authority estimates the contract at €644,765.93 excluding VAT, with a three-month duration.
The tender has an estimated value of €9,856,725.72 excluding VAT and a planned duration of 33 months.