Westgold records an annualised 2 million-tonne rate at Beta Hunt
The September run rate is not annual production; the company is targeting sustained output at that pace from Q2 FY27.
Event / data period: 2026-10-21
Published: · Updated:

Westgold Resources said on 21 October that its Beta Hunt underground mine in Western Australia achieved an annualised mining rate of 2 million tonnes in September. The company said this was recorded before its interim primary ventilation system was commissioned ahead of schedule at month-end.
Westgold said it invested A$33.3 million over two years to address constraints through ventilation, dewatering, water supply, power distribution and underground infrastructure upgrades. It is targeting sustained mining at 2 million tonnes per annum from Q2 FY27; that future target is distinct from the annualised September rate.
Data
Beta Hunt mining rates
The September annualised rate and Westgold’s target for a sustained rate from the second quarter of FY27.
- Annualised mining rate
- 2 million tonnes per annum
- 2026-09 · Estimate
- Target sustained mining rate
- 2 million tonnes per annum
- 2026-10 — 2026-12 · Target
Methodology
The company reported an annualised September rate: this is a calculated rate, not tonnes mined over a full year. The sustained rate is a future target for Q2 FY27.
Updated:
Subjects and places
Subject proposals
- Business enterpriseSuggested
- Preserved editorial category/topic; broad candidate onlywww.newswire.ca ↗
Geographic references
Only source-provided geographic references are shown. Opening an external map is optional. Optional story maps use OpenStreetMap. Opening a map sends your IP address and this site’s address to the map provider; location data remains readable as text without loading the map.
- Australia · Place role: Coverage · Place type: Country or area · Location precision: RegionalEvidence
- Explicit preserved editorial country/region; no city or national centroid inferredwww.newswire.ca ↗