Infrastructure / WORLD

Graham Infrastructure wins C$33 million Agassiz-Rosedale Bridge rehabilitation

On 18 September 2026 British Columbia said it has awarded Graham Infrastructure LP a C$33 million contract to rehabilitate the Agassiz-Rosedale Bridge on Highway 9, with construction expected to take about three years.

Reading sizeSources ↓Share story ↗
Conceptual illustration of transport, bridges and infrastructure connections.Illustration
Symbolic illustration

On 18 September 2026 the Province of British Columbia announced that it has awarded a C$33 million major works contract to B.C.-based Graham Infrastructure LP for the rehabilitation of the Agassiz-Rosedale Bridge over the Fraser River. Construction is expected to begin in September 2026 and take approximately three years to complete.

The bridge opened in 1956, carries two lanes of Highway 9 between Highway 1 and Highway 7, and handles nearly 15,000 vehicles a day. The work will address deterioration of structural steel and concrete, improve drainage and extend the bridge’s operational service life by an estimated 50 years. Key tasks include replacing deck expansion joints, rehabilitating structural components, removing corrosion and recoating the structure.

Most of the work will take place beneath the bridge. From as early as 21 September 2026 the ministry expects nightly single-lane alternating traffic, with maximum delays of about 15 minutes, and occasional overnight full closures of up to 15 minutes at a time; it pointed drivers to a detour over the Mission Bridge.

Data

Key figures

Contract and bridge figures

Contract value, expected construction duration, expected service-life extension and traffic volume stated in the British Columbia information bulletin of 18 September 2026.

Value of the rehabilitation contract
33 million CAD
2026-09-18 · Observed
Expected construction duration
≈3 years
2026-09-18 · Target
Estimated extension of the bridge’s operational service life
50 years
2026-09-18 · Estimate
Vehicles crossing the bridge each day (current)
≈15,000 vehicles per day
2026-09-18 · Observed
Methodology

The C$33 million is the value of the major works contract awarded to Graham Infrastructure LP. The bulletin writes it with a dollar sign and no currency code; it is recorded as Canadian dollars because the issuer is the Province of British Columbia. The three years is the bulletin’s expected construction duration, and the 50 years is its estimate of the extension to the bridge’s operational service life. The 15,000 vehicles a day is the bridge’s current traffic, described in the bulletin as nearly 15,000, not a result of the project.

Updated:

Structured coverage

Subjects and places

Subject proposals

Geographic references

Only source-provided geographic references are shown. Opening an external map is optional. Optional story maps use OpenStreetMap. Opening a map sends your IP address and this site’s address to the map provider; location data remains readable as text without loading the map.

  • Canada · Place role: Coverage · Place type: Country or area · Location precision: Regional
    Evidence
    • Explicit preserved editorial country/region; no city or national centroid inferrednews.gov.bc.ca ↗
Taxonomy version: IPTC Media Topics 2026-Q2

Continue reading

Infrastructure

Emil Anderson Group to build C$119.4 million Peardonville Road crossing of Highway 1

On 17 September 2026 British Columbia said work is getting underway on a new Peardonville Road crossing of Highway 1 in Abbotsford, under a C$119.4 million contract awarded to Emil Anderson Group, with completion expected in 2031.

Government of British Columbia (Ministry of Transportation and Transit)2 min read
Data included
Infrastructure

Infrastructure Partners of Ontario to manage construction of Highway 410 Extension

On 1 September 2026 Ontario said Infrastructure Partners of Ontario, a joint venture of Miller Paving, GIP and Amico, has won the construction manager contract for the 9.1-kilometre Highway 410 Extension. No contract value was given.

Government of Ontario (Ministry of Transportation)2 min read
Data included