Brazil opens declaration window for 2026 existing-power auctions
The energy ministry asked distributors to submit or amend purchase-need declarations for the A-1, A-2 and A-3 auctions by 30 October.
Event / data period: 2026-10-19
Published: · Updated:

Brazil’s Ministry of Mines and Energy (MME) opened the declaration period for distributors participating in the 2026 A-1, A-2 and A-3 auctions for existing electricity generation. Companies can confirm or amend their purchase-need information through the CCEE platform until 30 October. The ministry said declarations must remain confidential until the bidding process ends.
The three auctions are scheduled to run sequentially on 13 November 2026 and cover electricity from existing generation plants. Supply is set to begin on 1 January 2027 for A-1, 1 January 2028 for A-2 and 1 January 2029 for A-3. The resulting regulated-market contracts will be for energy quantities and last two years.
Data
Existing-power auction schedule
Dates and supply-start years stated by MME for the 2026 auctions.
| A-1 | 2027 |
| A-2 | 2028 |
| A-3 | 2029 |
Methodology
Schedule stated by the source; the start year is recorded numerically.
Updated:
Subjects and places
Subject proposals
- Energy and resourceSuggested
- Preserved editorial category/topic; broad candidate onlywww.gov.br ↗
Geographic references
Only source-provided geographic references are shown. Opening an external map is optional. Optional story maps use OpenStreetMap. Opening a map sends your IP address and this site’s address to the map provider; location data remains readable as text without loading the map.
- Brazil · Place role: Coverage · Place type: Country or area · Location precision: RegionalEvidence
- Explicit preserved editorial country/region; no city or national centroid inferredwww.gov.br ↗