Baluma Solar modification screened out of full environmental assessment
Spain’s environmental authority decided that modifications to the 58.14 MW Baluma Solar installation in Granada do not require a full environmental impact assessment. The decision appeared in the BOE on 17 October.
Event / data period: 2026-09-21
Published: · Updated:
The change includes burying part of the 220 kV evacuation line near the Cubillas River. The selected route is about 1,152 metres long.
The screening outcome depends on compliance with the original project conditions and additional safeguards; it does not announce new construction or commissioning.
Data
Source and measure
Project information stated in the official source.
| Kurulu güç | 58.14 |
Methodology
The source states 58.14 MW as the installation’s capacity; this is not additional capacity created by the modification.
Updated:
Subjects and places
Subject proposals
- Solar powerSuggested
- Subject suggested from the title or summary: Solarwww.boe.es ↗
- EnvironmentSuggested
- Preserved editorial category/topic; broad candidate onlywww.boe.es ↗
Geographic references
Only source-provided geographic references are shown. Opening an external map is optional. Optional story maps use OpenStreetMap. Opening a map sends your IP address and this site’s address to the map provider; location data remains readable as text without loading the map.
- Spain · Place role: Coverage · Place type: Country or area · Location precision: RegionalEvidence
- Explicit preserved editorial country/region; no city or national centroid inferredwww.boe.es ↗