NEWSVERUM / Global briefing

Electricidad · Newsverum

21 stories

Follow global economy, business, finance, energy, climate and public affairs through original sources, sourced data and context.

Filter results

Spain · Only stories with data

Only stories with data

Clear filters
Energy

Spain publishes acceptance of Enel’s withdrawal from El Clavel solar application

Spain published a decision accepting Enel Green Power España’s withdrawal of its preliminary administrative-authorisation application for the proposed El Clavel photovoltaic plant. The decision was signed on 20 May and appeared in the Official State Gazette on 31 October, closing file SGIISE/PFot-933.

Agencia Estatal Boletín Oficial del Estado (BOE)1 min read Data included
Energy

Spain’s 200 MWp Villameca solar plant enters commercial operation

Recurrent Energy announced on 15 October that the Villameca solar plant in Spain’s Castilla y León region had entered commercial operation. The Canadian Solar subsidiary reported 200 MWp of solar peak capacity, a power rating rather than a quantity of electricity already generated.

Canadian Solar / Recurrent Energy1 min read Data included
Economy

Arteche signs syndicated financing of up to €200 million

Arteche signed a syndicated financing agreement for a maximum €200 million on 30 October, the electrical-equipment group disclosed to Spain’s CNMV. The agreement is divided into two tranches.

Arteche, filing published by CNMV1 min read Data included
Energy

Spain rejected the permit application for Los Campillos

The decision rejected the permit application for the Los Campillos project, which had a proposed installed power of 33.825 MW. It was published in the BOE on 2026-10-20.

Boletín Oficial del Estado (BOE)1 min read Data included
Energy

Spain accepted the withdrawal of the application for Nordés

The decision accepted the withdrawal of the application for the Nordés project, which had a proposed installed power of 67.2 MW. It was published in the BOE on 2026-10-20.

Boletín Oficial del Estado (BOE)1 min read Data included
Energy

Spain accepted the withdrawal of the application for Mistral

The decision accepted the withdrawal of the application for the Mistral project, which had a proposed installed power of 106.4 MW. It was published in the BOE on 2026-10-19.

Boletín Oficial del Estado (BOE)1 min read Data included
Energy

Spain rejected the permit application for Ampliación El Páramo

The decision rejected the permit application for the Ampliación El Páramo project, which had a proposed installed power of 50.88 MW. It was published in the BOE on 2026-10-17.

Boletín Oficial del Estado (BOE)1 min read Data included