Spain accepted the withdrawal of the application for Nordés
The decision accepted the withdrawal of the application for the Nordés project, which had a proposed installed power of 67.2 MW. It was published in the BOE on 2026-10-20.
Event / data period: 2026-10-20
Published: · Updated:

The decision accepts the applicant’s withdrawal of its permit request. This is not a technical approval or rejection by the regulator and grants no construction authorization.
Data
Project power in the BOE decision
Installed power of the authorized or assessed project components.
| Project power | 67.2 |
Methodology
MW value is transcribed from the BOE decision heading; it is not realized generation.
Updated:
Subjects and places
Subject proposals
- Energy and resourceSuggested
- Preserved editorial category/topic; broad candidate onlywww.boe.es ↗
Geographic references
Only source-provided geographic references are shown. Opening an external map is optional. Optional story maps use OpenStreetMap. Opening a map sends your IP address and this site’s address to the map provider; location data remains readable as text without loading the map.
- Spain · Place role: Coverage · Place type: Country or area · Location precision: RegionalEvidence
- Explicit preserved editorial country/region; no city or national centroid inferredwww.boe.es ↗