Spain authorizes 400 kV synchronous compensator at Brovales substation
The BOE published on 20 October an authorization for Red Eléctrica de España to expand the Brovales substation near Jerez de los Caballeros, Badajoz.
Event / data period: 2026-10-20
Published: · Updated:

The authorization covers a synchronous compensator and its associated bay in the substation’s existing 400 kV section.
Synchronous compensators help manage reactive power and voltage on the grid. The decision authorizes construction; it does not report that the equipment has entered service.
Data
Project figure in decision
Project value stated in the official decision.
| Substation voltage | 400 |
Methodology
Value transcribed from the source; it must not be read as realized generation or completed construction.
Updated:
Subjects and places
Subject proposals
- Energy and resourceSuggested
- Preserved editorial category/topic; broad candidate onlywww.boe.es ↗
- ElectricitySuggested
- Subject suggested from the title or summary: kVwww.boe.es ↗
Geographic references
Only source-provided geographic references are shown. Opening an external map is optional. Optional story maps use OpenStreetMap. Opening a map sends your IP address and this site’s address to the map provider; location data remains readable as text without loading the map.
- Spain · Place role: Coverage · Place type: Country or area · Location precision: RegionalEvidence
- Explicit preserved editorial country/region; no city or national centroid inferredwww.boe.es ↗