Infrastructure / WORLD

Guadix power-line upgrade enters public consultation for permits and public-utility declaration

Andalusia’s territorial authority in Granada opened public information on an application to upgrade an existing medium-voltage overhead line in Guadix, in a BOE notice published on 19 October.

Reading sizeSources ↓Share story ↗
Conceptual illustration of transport, bridges and infrastructure connections.Illustration
Symbolic illustration

The proposal would replace the existing LA56 conductor with insulated LA56, raise supports to 26 metres, remove 3,141.8753 metres of existing line and install 3,115.6 metres with 35 new supports. The stated aim is to improve supply safety and quality.

The notice concerns prior administrative and construction authorisation and a declaration of public utility. It is a proposed project under consultation, not an operating upgrade or final approval; the public-utility process may affect land rights if granted.

Data

Table

Proposed line renewal

Project quantities in an application for permits and public utility; construction is not approved as completed.

Project quantities stated in the application3141.87533115.63635
Methodology

Quantities in the project application published in the BOE. It reports 3,141.8753 m to be removed and 3,115.6 m to be installed; figures are from the application.

Updated:

Structured coverage

Subjects and places

Subject proposals

Geographic references

Only source-provided geographic references are shown. Opening an external map is optional. Optional story maps use OpenStreetMap. Opening a map sends your IP address and this site’s address to the map provider; location data remains readable as text without loading the map.

  • Spain · Place role: Coverage · Place type: Country or area · Location precision: Regional
    Evidence
    • Explicit preserved editorial country/region; no city or national centroid inferredwww.boe.es ↗
Taxonomy version: IPTC Media Topics 2026-Q2

Continue reading