Canada launches $1.75 billion venture and growth capital plan
The federal plan combines a $1 billion Growth VCCI with a separate $750 million early- and growth-stage strategy; private-capital totals remain projections.
Source-grounded global reporting on international affairs, politics, public institutions, safety, business, economics, science, environment and infrastructure. (Page 161 of 430)
The federal plan combines a $1 billion Growth VCCI with a separate $750 million early- and growth-stage strategy; private-capital totals remain projections.
Three more holes from the completed 14-hole program included 52.8 g/t gold and 0.83% antimony over 4.64 metres of core.
Banca d’Italia named six groups as other systemically important institutions for 2027. Their additional capital buffers range from 0.25% to 1.25% of total risk-weighted exposures and take effect on 1 January.
The grid operator attributes lower consumption, more than €90 million in estimated savings and about 140,000 tonnes of avoided CO₂ to the 2026 daylight-saving period. Its historical comparison reaches back to 2004.
A Saudi Press Agency report describes a small craft using discarded date seeds; it gives no production or sales figures.
The sixth aircraft departed on October 24 as the operation began loading aid onto a ship for maritime delivery.
Its first FY2025–26 report cites C$3.07 billion in sales and survey results; the source does not provide full survey methods.
The company said Red Eye stockpile material was processed in September, while assays and sale remained pending; Dominion material is being arranged for transport.
At an October 22 workshop, Nigerian officials and FAO urged stronger surveillance and biosecurity against avian influenza. The ministry said a US$350,000 emergency grant is expected to run through April 2027.
A 16-member inter-agency panel will review standards for lithium-battery solar systems and propose rules covering installation, maintenance and disposal. The government has announced a standards-development process, not new binding regulations.
The transportation ministry reported progress during an October 23 inspection. Officials said about 10 kilometres remained on the inspected stretch and identified land acquisition and compensation in Kaduna as a delay to the link with Abuja.
The municipalities will cut development charges for three years; funding and potential housing figures remain estimates.