FERC preliminarily finds Uma Lagne’s 5-kW Arizona canal hydro project qualifies
Staff said the single-turbine project on the Buckeye canal meets conduit hydropower criteria.
Event / data period: 2026-10-15
Published: · Updated:

Uma Lagne Energy Holdings filed a notice of intent on 1 October for its Buckeye Hydrokinetic PHX5 Project. It proposes one 5-kW modular hydrokinetic turbine along the Buckeye Main Canal, operated by the Buckeye Water Conservation and Drainage District in Maricopa County, Arizona.
FERC staff preliminarily found the project would not change the canal’s agricultural water-delivery purpose and meets qualifying conduit hydropower criteria. Such a qualifying facility does not require a licence or licensing exemption. Comments and intervention motions are due by 16 November 2026.
Data
FERC preliminarily finds Uma Lagne’s 5-kW Arizona canal hydro project qualifies
- · Scheduled
Comments and intervention deadline
Comments contesting the preliminary qualification and intervention motions in docket CD27-1-000 are due by this date.
Methodology
The date is the deadline stated in FERC’s notice; the project capacity is retained as stated in the source.
Updated:
Subjects and places
Subject proposals
- Renewable energySuggested
- Subject suggested from the title or summary: hydropowerwww.federalregister.gov ↗
Geographic references
Only source-provided geographic references are shown. Opening an external map is optional. Optional story maps use OpenStreetMap. Opening a map sends your IP address and this site’s address to the map provider; location data remains readable as text without loading the map.
- United States · Place role: Coverage · Place type: Country or area · Location precision: RegionalEvidence
- Explicit preserved editorial country/region; no city or national centroid inferredwww.federalregister.gov ↗