UK removes planning permission for cross-pavement home EV chargers
The UK Department for Transport said from 21 October drivers can install qualifying cross-pavement home EV chargers without planning permission. The government said removing the permission process could save up to £300 on installation and make home charging available from 2p per mile.
Event / data period: 2026-10-21
Published: · Updated:

The measure is aimed at residents without off-street parking, allowing a cable channel to connect a home to a car parked at the kerb. The department also announced planning changes intended to simplify larger public charging hubs and opened consultations on access for tenants and leaseholders and charger requirements in new or refurbished covered car parks.
Data
Costs stated by the government
Maximum installation saving in GBP and starting home-charging price in GBP per mile as stated by the government.
| Maximum installation saving | 300 |
| Home charging cost (per mile) | 0.02 |
Methodology
Figures retain the government’s “up to” saving and “from” cost qualifications; no user-specific cost is calculated. The source’s 2 pence is shown as GBP 0.02, using 100 pence = GBP 1.
Updated:
Subjects and places
Subject proposals
- Infrastructure projectsSuggested
- Preserved editorial category/topic; broad candidate onlywww.gov.uk ↗
- TransportSuggested
- Subject suggested from the title or summary: Transportwww.gov.uk ↗
Geographic references
Only source-provided geographic references are shown. Opening an external map is optional. Optional story maps use OpenStreetMap. Opening a map sends your IP address and this site’s address to the map provider; location data remains readable as text without loading the map.
- United Kingdom · Place role: Coverage · Place type: Country or area · Location precision: RegionalEvidence
- Explicit preserved editorial country/region; no city or national centroid inferredwww.gov.uk ↗