Business / WORLD

New Found Gold reports first quarterly output from Hammerdown

The company produced 4,863 ounces of gold and sold 6,035 ounces in Q3.

Reading sizeSources ↓Share story ↗
Conceptual illustration of industry, engineering and logistics connections.Illustration
Symbolic illustration

New Found Gold reported preliminary operating results for the quarter ended September 30 at its Hammerdown gold mine in Newfoundland on October 15. The company said it produced 4,863 ounces of gold, sold 6,035 ounces and achieved average recovery of 85%. The mine had entered commercial production on August 19.

Hammerdown and the Pine Cove mill met or exceeded key production targets during the quarter, according to the company, which described the figures as preliminary. The release also said construction of an on-site crusher and sorter was expected to be substantially complete in Q4 2026, followed by commissioning and ramp-up in Q1 2027. Those facility milestones are forward-looking expectations, not completed results.

Data

Table

Hammerdown Q3 2026

Preliminary quarterly production figures reported by New Found Gold

Gold produced4863
Gold sold6035
Methodology

Figures are the company’s preliminary operating report; they are not audited or independently verified.

Updated:

Structured coverage

Subjects and places

Subject proposals

Geographic references

Only source-provided geographic references are shown. Opening an external map is optional. Optional story maps use OpenStreetMap. Opening a map sends your IP address and this site’s address to the map provider; location data remains readable as text without loading the map.

  • Canada · Place role: Coverage · Place type: Country or area · Location precision: Regional
    Evidence
Taxonomy version: IPTC Media Topics 2026-Q2

Continue reading

Business

Thor lowers Segilola outlook after rainfall

Segilola poured 15,515 ounces in Q3; 2026 production guidance was cut to 70,000–72,000 ounces.

Thor Explorations Ltd. (Newsfile Corp.)1 min read
Data included