Energy / WORLD

Iran company exceeded first-half output plans

Iran’s Central Oil Fields Company reported delivering 106% of its South Zagros gas plan and 101% of its oil plan in the first half of Iranian year 1405.

The source does not state the event date; the period shown is the source review period.

Reading sizeSources ↓Share story ↗
Conceptual illustration of electricity generation, storage and connected data.Illustration
Symbolic illustration

Iran’s Central Oil Fields Company reported delivering 106% of its South Zagros gas plan and 101% of its oil plan in the first half of Iranian year 1405.

Figures cited by Shana put regional output at about 24.945 billion cubic metres of gas, 6.7 million barrels of gas condensate and about 1.4 million barrels of oil. Western oil output reached 103% of plan and Tang Bijar gas output 106%; eastern gas output rose by 1 billion cubic metres year on year.

Data

Timeline

Reported energy development

Iran’s Central Oil Fields Company reported delivering 106% of its South Zagros gas plan and 101% of its oil plan in the first half of Iranian year 1405.

  1. · Occurred

    Iran company exceeded first-half output plans

    Iran’s Central Oil Fields Company reported delivering 106% of its South Zagros gas plan and 101% of its oil plan in the first half of Iranian year 1405.

Methodology

Figures and operational details from the company account cited by Shana are summarized; estimates or unspecified measurement periods are identified.

Updated:

Structured coverage

Subjects and places

Subject proposals

Geographic references

Only source-provided geographic references are shown. Opening an external map is optional. Optional story maps use OpenStreetMap. Opening a map sends your IP address and this site’s address to the map provider; location data remains readable as text without loading the map.

  • Iran · Place role: Coverage · Place type: Country or area · Location precision: Regional
    Evidence
    • Explicit preserved editorial country/region; no city or national centroid inferredwww.shana.ir ↗
Taxonomy version: IPTC Media Topics 2026-Q2

Continue reading

Energy

South Pars restores 100 million cubic metres of lost gas capacity

Iran’s South Pars Gas Complex restored 100 million cubic metres of lost production capacity through early-production and operational work at damaged refineries, the Petroleum Ministry’s Shana news agency reported on October 9. Managing director Gholam Abbas Hosseini said debris removal had been completed at the four affected refineries.

Shana News Agency (Iranian Ministry of Petroleum)1 min read
Data included
Energy

Bidboland maintenance work completed

Iran’s Bidboland Gas Refinery said it completed its annual major maintenance programme before winter. Process units, compressors, instrumentation and transfer lines were inspected and maintained.

Shana, citing Bidboland Gas Refinery1 min read
Data included