Business / WORLD

Katanda plant in Kasaï-Oriental targets first cement bags in early 2027

Agence Congolaise de Presse reported on October 17 that the company’s technical director said during a site visit that about 80% of the plant was complete. First cement bags are targeted for Q1 2027.

Reading sizeSources ↓Share story ↗
Conceptual illustration of industry, engineering and logistics connections.Illustration
Symbolic illustration

The project began in August 2024 in Kabwe, in Bakwa Ndoba territory. The company plans capacity of 1.2 million tonnes a year, with 300,000 tonnes a year in the first phase. The head of the presidential civil office said logistics for moving materials and equipment from Lubumbashi, along with administrative issues, continued to delay the project.

Data

Table

Katanda cement plant targets first output in Q1 2027

ACP reported that construction at a private cement project in Kasaï-Oriental was nearly 80% complete, with first bags planned for Q1 2027.

Plant design capacity1.2---Planned capacity; not actual output2026-10-17
Planned first-phase capacity0.3---Planned capacity; not actual output2026-10-17
Reported construction progress-80-2026-10-16Company estimate of nearly 80% completion; October 16 site visit2026-10-17
Cement price for a 50-kg bag in Kinshasa, as reported--About USD11 per 50-kg bag-Price comparison reported by the source; not a live market quote2026-10-17
Cement price for a 50-kg bag in Kasaï-Oriental, as reported--Up to USD30 per 50-kg bag-Price comparison reported by the source; not a live market quote2026-10-17
Methodology

Capacity figures are company-planned design and first-phase capacities, not measured output. The nearly 80% construction progress figure is the company technical director’s reported site-visit estimate, not an independently verified measurement. Completion and first production remain future company targets.

Updated:

Structured coverage

Subjects and places

Subject proposals

Geographic references

Only source-provided geographic references are shown. Opening an external map is optional. Optional story maps use OpenStreetMap. Opening a map sends your IP address and this site’s address to the map provider; location data remains readable as text without loading the map.

  • Congo - Kinshasa · Place role: Coverage · Place type: Country or area · Location precision: Regional
    Evidence
    • Explicit preserved editorial country/region; no city or national centroid inferredacp.cd ↗
Taxonomy version: IPTC Media Topics 2026-Q2

Continue reading

Business

Kunduz iron-melting plant opens with 300-tonne daily rebar capacity

Afghanistan’s Office of the Deputy Prime Minister for Economic Affairs said the Khatiz Lmar iron-melting plant opened in Kunduz on 17 September. It reported $8.6 million in investment by a foreign company and capacity of 300 metric tonnes of rebar per day.

Afghanistan Deputy Prime Minister for Economic Affairs1 min read Data included
Business

Valor targets Courageous Lake study update for early 2028

Valor Gold outlined optimization work aimed at an updated pre-feasibility study for Courageous Lake in Canada’s Northwest Territories in the first quarter of 2028.

Valor Gold (Newsfile Corp.)1 min read Data included