Energy / WORLD

DOE and PNNL open second wildfire-risk assistance phase for utilities

Applications for the WISE program are due November 10, with assistance for selected utilities set to begin in January 2027.

Reading sizeSources ↓Share story ↗
Conceptual illustration of electricity generation, storage and connected data.Illustration
Symbolic illustration

The U.S. Department of Energy’s Office of Electricity and Pacific Northwest National Laboratory opened applications for Phase 2 of the WISE wildfire technical-assistance program for electric utilities. The no-cost program provides data-driven tools and analytics to help utilities assess localized wildfire risks and strengthen prevention, mitigation, preparedness, response and recovery work.

Applications close November 10, 2026, at 8 p.m. Eastern Time. Assistance for selected utilities is set to begin in January 2027, according to DOE. The department said Phase 1 engaged eight utilities, including rural cooperatives, public utility districts and municipalities.

Data

Table

WISE Phase 2 timeline and scope

Program terms in DOE’s October 14 announcement.

Applications closeNovember 10, 2026, 8 p.m. ET
Phase 2 assistance startJanuary 2027 (planned)
Phase 1 cohort8 utilities
Methodology

The application deadline, planned start and Phase 1 participant count are reproduced as reported; DOE did not state how many utilities Phase 2 will select.

Updated:

Structured coverage

Subjects and places

Subject proposals

Geographic references

Only source-provided geographic references are shown. Opening an external map is optional. Optional story maps use OpenStreetMap. Opening a map sends your IP address and this site’s address to the map provider; location data remains readable as text without loading the map.

  • United States · Place role: Coverage · Place type: Country or area · Location precision: Regional
    Evidence
    • Explicit preserved editorial country/region; no city or national centroid inferredwww.energy.gov ↗
Taxonomy version: IPTC Media Topics 2026-Q2

Continue reading