Bharat Coking Coal returns to quarterly profit as output rises, while half-year production remains lower
The miner reported 7.22 million tonnes of coal production in Q2 FY2026–27, up 7.6% year on year, but first-half output was down 12.5%; quarterly profit also included compensation income.
Event / data period: 2026-09-30
Published: · Updated:

Bharat Coking Coal Ltd. reported higher production and offtake in the July–September quarter, alongside a return to profit after a year-earlier loss. Its presentation filed with the National Stock Exchange on 25 October lists 7.22 million tonnes of production, up from 6.71 million tonnes in Q2 a year earlier. Offtake rose to 8.89 million tonnes from 8.11 million tonnes. The board approved reviewed results for the quarter and half-year ended 30 September. The financial statements are standalone results for Bharat Coking Coal Limited, not consolidated group accounts.
Revenue from operations for the quarter reached ₹4,412.58 crore, compared with ₹3,173.25 crore in the prior-year quarter. Profit after tax was ₹123.74 crore, against a loss of ₹52.99 crore. The presentation separately lists ₹386.95 crore of performance incentive and compensation income in the current quarter, compared with zero in the year-earlier period. That item is relevant context for the comparison; the filing does not attribute the entire profit change to it.
The quarterly improvement did not erase the weaker first-half production comparison. Coal output for the six months through September was 13.78 million tonnes, down from 15.75 million tonnes a year earlier; overburden removal fell to 64.87 million cubic metres from 81.76 million. Offtake in the half-year was 16.61 million tonnes, versus 17.05 million tonnes. The company’s presentation reports each measure separately and compares corresponding financial-year periods.
The company also highlighted capacity and logistics changes during the half-year. A newly built Bhojudih washery, with capacity of 2 million tonnes a year, began commercial operations on 26 May, bringing total washing capacity to 17.35 million tonnes, including the TSL washery. The Maheshpur rapid-loading system began operating on 20 September after a trial rake; its stated capacity is 5 million tonnes a year.
Coking-coal sales realisation for the half-year was ₹10,259.63 crore, against ₹7,817.65 crore in the same period last year, the presentation said. These results combine output, sales and financial measures, but the company’s reported quarter-on-quarter and year-on-year comparisons should not be treated as a forecast. Production was above the prior-year quarter but remained below the first-half level a year earlier.
Data
Bharat Coking Coal Q2 FY2026–27 operating and financial measures
Quarterly production, offtake and reported financial results compared with the prior-year quarter.
- Coal production, Q2 FY2026–27
- 7.22 million tonnes
- 2026-09 · Observed
- Coal production, Q2 FY2025–26
- 6.71 million tonnes
- 2025-09 · Observed
- Coal offtake, Q2 FY2026–27
- 8.89 million tonnes
- 2026-09 · Observed
- Coal offtake, Q2 FY2025–26
- 8.11 million tonnes
- 2025-09 · Observed
- Standalone — Operating revenue, Q2 FY2026–27
- 4,412.58 crore INR
- 2026-09 · Observed
- Standalone — Operating revenue, Q2 FY2025–26
- 3,173.25 crore INR
- 2025-09 · Observed
- Standalone — Profit after tax, Q2 FY2026–27
- 123.74 crore INR
- 2026-09 · Observed
- Standalone — Profit/(loss) after tax, Q2 FY2025–26
- -52.99 crore INR
- 2025-09 · Observed
Methodology
Figures are transcribed from BCCL’s company presentation and its exchange-filed financial statements. Financial amounts are in crore INR as reported; production and offtake are million tonnes. Prior-year comparison periods are the corresponding quarter. The filing labels results reviewed/unaudited; the presentation’s narrative and measurement bases are retained. The financial figures and profit comparisons are explicitly standalone; the company presentation’s operating measures are presented on the same company basis.
Updated:
Subjects and places
Subject proposals
- CoalSuggested
- Subject suggested from the title or summary: Coalnsearchives.nseindia.com ↗nsearchives.nseindia.com ↗
Geographic references
Only source-provided geographic references are shown. Opening an external map is optional. Optional story maps use OpenStreetMap. Opening a map sends your IP address and this site’s address to the map provider; location data remains readable as text without loading the map.
- India · Place role: Coverage · Place type: Country or area · Location precision: RegionalEvidence
- Explicit preserved editorial country/region; no city or national centroid inferrednsearchives.nseindia.com ↗nsearchives.nseindia.com ↗