Infrastructure / WORLD

Asas Makeen signs Ittihad Althabat for Riyadh residential and commercial works

Asas Makeen signed a turnkey, cost-plus-fee construction contract with Ittihad Althabat on 17 September 2026 for Riyadh residential and commercial projects with a total estimated cost of SAR 315,000,000, excluding VAT.

Reading sizeSources ↓Share story ↗
Conceptual illustration of transport, bridges and infrastructure connections.Illustration
Symbolic illustration

Asas Makeen Real Estate Development and Investment Co. announced on 17 September 2026 that it signed a construction contract with Ittihad Althabat Company for Contracting. The contractor will carry out contracting, construction and finishing works for a number of residential and commercial projects that Asas Makeen owns and develops in Riyadh, covering a total area of approximately 65,000 square metres, on a cost-plus-fee basis.

The company put the total estimated cost of the projects at SAR 315,000,000, including the contractor’s fees and expenses and excluding VAT, and said the final cost will follow the approved cost of each project. The works are on a turnkey basis. The budget, scope, specifications and schedule of each project will be approved separately before it starts. Each project has an 18-month execution period, unless a different period is approved in writing, counted from the approval of plans by the Ministry of Municipalities and Housing.

Asas Makeen said the financial impact will appear gradually in its statements as work progresses, in line with actual costs and monthly progress payment certificates for each project. It reported no related parties.

Data

Key figures

Contract figures

Estimated cost, project area and execution period stated in Asas Makeen’s Saudi Exchange announcement of 17 September 2026.

Total estimated cost of the covered projects, excluding VAT
315,000,000 SAR
2026-09-17 · Estimate
Total area of the covered projects
≈65,000 square metres
2026-09-17 · Target
Execution period per project
18 months
2026-09-17 · Observed
Methodology

The cost is the company’s total estimate for the projects covered, including contractor fees and expenses and excluding VAT; the final cost will follow each project’s approved cost. The area is approximate. The 18-month period applies to each project separately and counts from approval of plans by the Ministry of Municipalities and Housing.

Updated:

Structured coverage

Subjects and places

Subject proposals

Geographic references

Only source-provided geographic references are shown. Opening an external map is optional. Optional story maps use OpenStreetMap. Opening a map sends your IP address and this site’s address to the map provider; location data remains readable as text without loading the map.

  • Saudi Arabia · Place role: Coverage · Place type: Country or area · Location precision: Regional
    Evidence
Taxonomy version: IPTC Media Topics 2026-Q2

Continue reading

Infrastructure

Al Akaria signs MOBCO for Package One of Porta Jeddah mixed-use project

Saudi Real Estate Company (Al Akaria) signed a SAR 463,132,910 contract, excluding VAT, with MOBCO on 15 September 2026 for Package One of the Porta Jeddah mixed-use project in Jeddah, running 820 calendar days.

Saudi Real Estate Company (Al Akaria) via Saudi Exchange2 min read
Data included
Infrastructure

Maharat Al Injaz signs structural works contract for SMC3 hospital in Riyadh

SMC Healthcare signed a SAR 148,447,428.50 contract, excluding VAT, with Maharat Al Injaz on 27 September 2026 for foundation, construction and structural works at the planned 296-bed SMC3 Hospital in Riyadh.

Specialized Medical Company (SMC Healthcare) via Saudi Exchange2 min read
Data included
Infrastructure

BEC Arabia signs mechanical and electrical works contract for Al Khobar hospital

Almoosa Health signed a SAR 781,656,783 contract, excluding VAT, with BEC Arabia Contracting Company on 21 September 2026 for mechanical and electrical works at the Almoosa Specialized Hospital in Al Khobar, due within 24 months.

Almoosa Health Company via Saudi Exchange1 min read
Data included