Syria opens Arab Gas Pipeline link and training center
Homs section connects 186 kilometres to the existing network.
Follow global economy, business, finance, energy, climate and public affairs through original sources, sourced data and context.
Homs section connects 186 kilometres to the existing network.
Luanda visit advances renewable and network cooperation.
Agreement covers offshore Kwanza Blocks 8 and 22.
NSF work combines engineering support, operations, maintenance and logistics.
The company acquires Plastic Energy’s remaining 35% stake.
The Brazilian survey will provide oil and gas exploration data.
The three-year well construction programme includes extension options.
Planned gross fluids handling capacity is 548,000 barrels per day.
Aggregate growth slowed from the previous quarter, while country-level results varied.