Quebec Inaugurates Bécancour Critical Minerals Chemical Refining Corridor
Investissement Québec commissions industrial battery-grade lithium hydroxide purification facility, solidifying the St. Lawrence clean technology value chain.
Article subject labels can be suggestions and are not editorial confirmation.
Investissement Québec commissions industrial battery-grade lithium hydroxide purification facility, solidifying the St. Lawrence clean technology value chain.
Consortium deploys multi-station 700-bar commercial hydrogen refuelling stations along Highway 2 corridor supporting long-haul zero-emission freight transport.
AIOC issues loan guarantee backing coalition of sixteen First Nations acquiring equity partnership in regional energy transmission infrastructure.
Caisse de dépôt et placement du Québec finalizes issuance of dedicated green sustainability bonds aimed at financing light rail electrified networks in Eastern Canada.
Alberta legislature ratifies statutory formula dedicating surplus non-renewable resource revenues into long-term sovereign wealth diversification portfolios.
Prince Edward Island legislature passes statutory coastal protection zoning requiring 100-year storm surge buffers for all future residential and commercial developments.
Yukon government and self-governing First Nations co-draft sweeping legislative replacement for the century-old Quartz Mining Act, enshrining free, prior and informed consent.
Metrolinx civil engineering crews successfully hoist prefabricated steel bridge truss over the Don Valley Parkway, connecting downtown subway tunnels to east end communities.
Canada's provincial and territorial premiers ratify unanimous agreement eliminating mutual regulatory divergences for professional certifications and commercial trucking.
The original report is withdrawn pending verification. On 22 September 2026 Calgary council approved an at-grade downtown Green Line alignment along 10 Avenue South, according to the city. The approved downtown segment does not include a tunnel; the city says detailed design and procurement must precede downtown construction. The separate southeast segment began construction in 2025.
The original report is withdrawn pending verification. On 2 June 2025 the provincial government announced that legislation enabling offshore renewable-energy development had entered into force. It said federal Bill C-49 passed in October 2024 and the province’s corresponding Bill 90 passed in March 2025. This earlier measure does not establish the reported new November 2026 act.
The original report is withdrawn pending verification. On 31 May 2024 the regional transport authority ARTM presented a proposal for a 38-kilometre surface tramway in eastern Montréal. It described a proposal subject to a Québec government decision, not a completed tunnel contract. This earlier report does not establish the alleged 2026 award.