Hydrogeologists with the Okanagan Basin Water Board released a three-dimensional digital model in Kelowna on 3 November 2026 mapping 85 interconnected alluvial aquifers across the 200-kilometer Okanagan Valley using data from 2,500 observation wells.
Okanagan Basin Water Board4 min read Data included
Port engineers commissioned two 6.6-kilovolt marine shore-power berths at the Centerm container terminal in Burrard Inlet on 3 November 2026, allowing docked vessels to shut down auxiliary diesel engines and cut berth emissions by over 95 percent.
Interior Health and BC Cancer awarded the primary construction contract on 3 November 2026 for the $359 million, five-storey Kamloops Cancer Centre at Royal Inland Hospital, housing three linear accelerator radiation vaults and a 30-bay chemotherapy clinic.
Construction crews with Island Health topped out the cross-laminated timber and concrete frame of the new 204-bed Cowichan District Hospital in Duncan on 3 November 2026, cutting embodied structural carbon by 35 percent.
Construction crews with Fraser Health completed deep-pile seismic foundation pours on 3 November 2026 for the 12-storey second acute care tower at Surrey Memorial Hospital, adding 350 private inpatient rooms and a 100-bay emergency trauma centre.
Highway construction crews with the BC Ministry of Transportation opened a $140 million, four-kilometer four-lane section of the Trans-Canada Highway east of Kamloops on 3 November 2026 with concrete median barriers and a grade-separated interchange.
City of Kelowna and airport officials inaugurated the $90 million Phase 1 terminal expansion at Kelowna International Airport on 3 November 2026, adding 5,500 square meters of passenger space and a six-lane CATSA security hall.
Structural ironworkers with the Transportation Investment Corporation tensioned the final steel stay-cable on the 170-meter tower of the new four-lane Pattullo Bridge connecting Surrey and New Westminster on 3 November 2026 across a 330-meter main span.
BC Ministry of Transportation and Infrastructure4 min read Data included
Water resource engineers in the Regional District of North Okanagan completed the $16 million seismic reconstruction of the Headgates reservoir dam in Coldstream on 3 November 2026, securing 1.2 million cubic meters of agricultural irrigation storage.
Regional District of North Okanagan4 min read Data included
The Metro Vancouver Regional District Board ratified regional zoning amendments on 3 November 2026 permitting four-storey ramp-accessed industrial logistics complexes along SkyTrain and highway corridors to ease sub-1.5 percent warehouse vacancy rates.
Provincial innovation officials and the Quantum Algorithms Institute unveiled a $35 million quantum computing commercialization hub at Simon Fraser University's downtown Vancouver campus on 3 November 2026, supporting 40 regional startups.
Orchardists in the Creston Valley inaugurated a $14 million computerized hydro-cooling and optical sorting packhouse on 3 November 2026, grading 15 tons of export sweet cherries per hour using 0.5-degree chilled water flumes.