The Official Gazette published on 2026-10-19 an administrative prior and construction authorization for the Hibridación Los Arcos battery storage module in Andorra, Teruel. Its installed power is 26.74 MW, and it is to be hybridized with an existing solar facility.
Boletín Oficial del Estado (BOE)1 min read Data included
The BOE published on 19 October an amendment to the agreement between ADIF and Metro de Madrid to prepare a joint construction design for remodelling the Méndez Álvaro rail stations.
Boletín Oficial del Estado (BOE)1 min read Data included
The Official Gazette published on 2026-10-19 an administrative prior and construction authorization for the Tesouro Storage battery storage module in As Pontes de García Rodríguez, A Coruña. Its installed power is 17.5 MW, and it is to be hybridized with an existing wind facility.
Boletín Oficial del Estado (BOE)1 min read Data included
The BOE published on 17 October ADIF’s third amendment and extension to its agreement with Extremadura and Mérida for a pedestrian-cycle bridge over the station tracks.
Boletín Oficial del Estado (BOE)1 min read Data included
ADIF awarded the contract to Baobab Soluciones SL for technical assistance to optimize its warehouse structure. The formalization notice was published in the BOE on 20 October.
Boletín Oficial del Estado (BOE)1 min read Data included
The Official Gazette published on 2026-10-20 an administrative prior and construction authorization for the BESS Hibridación FV Teruel battery storage module in Azaila, Teruel. Its installed power is 27.64 MW, and it is to be hybridized with an existing solar facility.
Boletín Oficial del Estado (BOE)1 min read Data included
ADIF opened a public consultation on property needed for a project to extend platforms and improve accessibility and evacuation at Alcorcón commuter station. The notice was published on 19 October.
Boletín Oficial del Estado (BOE)1 min read Data included