Explore the Newsverum news archive, editorial policies and categories in Turkish and English, with Arabic, French, Spanish, German and Portuguese editions. (Page 23 of 436)
Special parliamentary committee achieves cross-party consensus on new representation seat distribution reflecting interprovincial demographic shifts across Western Canada.
Parliament of Canada Committee Proceedings3 min read Data included
The original report is withdrawn pending verification. On 22 September 2026 Calgary council approved an at-grade downtown Green Line alignment along 10 Avenue South, according to the city. The approved downtown segment does not include a tunnel; the city says detailed design and procurement must precede downtown construction. The separate southeast segment began construction in 2025.
Unverified historical source reference (former attribution: City of Calgary Newsroom)2 min read Data included
The original report is withdrawn pending verification. On 2 June 2025 the provincial government announced that legislation enabling offshore renewable-energy development had entered into force. It said federal Bill C-49 passed in October 2024 and the province’s corresponding Bill 90 passed in March 2025. This earlier measure does not establish the reported new November 2026 act.
Unverified historical source reference (former attribution: House of Assembly of Newfoundland and Labrador Hansard)2 min read Data included
The original report is withdrawn pending verification. On 31 May 2024 the regional transport authority ARTM presented a proposal for a 38-kilometre surface tramway in eastern Montréal. It described a proposal subject to a Québec government decision, not a completed tunnel contract. This earlier report does not establish the alleged 2026 award.
Unverified historical source reference (former attribution: Autorité régionale de transport métropolitain Communiqué)2 min read Data included
The original report is withdrawn pending verification. On 30 June 2023 NB Power submitted an application to prepare a site for the separate ARC-100 project at Point Lepreau. The Canadian nuclear regulator’s project page, last modified on 26 January 2026 and checked on 11 November, describes the application as under review and the provincial environmental assessment as ongoing. Later decisions require separate verification; an application is not a licence.
Unverified historical source reference (former attribution: NB Power Media Centre)2 min read Data included
Provincial crop association integrates daily orbital multispectral imagery with field soil moisture sensors to reduce synthetic fertilizer application by twenty percent.
Manitoba Canola Growers Technical Dispatch3 min read Data included
Marine contractors with the Port Alberni Port Authority began driving steel pipe piles to modernize Berth 3 on 3 November 2026, deepening the terminal for Handymax cargo vessels and installing a 100-ton mobile harbor crane.
The Prince Rupert Port Authority and Metlakatla Development Corporation commissioned Phase 1 of the $750 million, 400-acre Ridley Island Export Logistics Platform on 3 November 2026 with 10 kilometers of unit-train loop tracks connected to Fairview Terminal.
Prince Rupert Port Authority4 min read Data included
Heavy rigging crews at BC Hydro's Revelstoke Generating Station lowered a 450-tonne Francis turbine rotor into the sixth generating bay on 3 November 2026 under a $580 million expansion raising peaking capacity by 500 megawatts to 3,000 megawatts.
Water utility engineers with the Sunshine Coast Regional District commissioned the expanded Church Road aquifer water treatment plant in Sechelt on 3 November 2026, delivering 5 million liters of UV-disinfected drinking water daily.
Sunshine Coast Regional District4 min read Data included