Osman Gazi platform’s Black Sea production timetable outlined
The September statement sets targets for deployment and year-end production preparations.
Event / data period:
Published: · Updated:

The ministry’s 17 September statement targeted sending the Osman Gazi floating production platform to the Black Sea in late October. First gas flaring under the second phase was planned by year-end.
The platform is expected to add 10 million cubic metres to daily output. This is a capacity target dependent on completed preparations, rather than production already achieved on the announcement date.
Subjects and places
Subject proposals
- Energy and resourceSuggested
- Preserved editorial category/topic; broad candidate onlywww.enerji.gov.tr ↗
Geographic references
Only source-provided geographic references are shown. Opening an external map is optional. Optional story maps use OpenStreetMap. Opening a map sends your IP address and this site’s address to the map provider; location data remains readable as text without loading the map.
- Türkiye · Place role: Coverage · Place type: Country or area · Location precision: RegionalEvidence
- Explicit preserved editorial country/region; no city or national centroid inferredwww.enerji.gov.tr ↗