India data-centre capacity reaches about 1.5 GW, four times 2020 level
A framework unveiled by NITI Aayog on 15 October says India’s data-centre capacity has grown from about 375 MW in 2020 to around 1.5 GW currently.
Event / data period: 2026-10-14
Published: · Updated:

NITI Aayog’s Frontier Tech Hub released a framework to help Indian states assess data-centre investment proposals. It said national capacity has grown from about 375 MW in 2020 to approximately 1.5 GW currently.
The framework covers five areas: power and energy; water and cooling; siting and environmental sustainability; economic and strategic value; and policy, governance and implementation. It advises states to assess resource and infrastructure demands alongside investment prospects.
Data
Capacity comparison
National data-centre capacity as reported by NITI Aayog.
| 2020 capacity | 375 |
| Current capacity at publication | 1500 |
Methodology
Approximate source figures; GW value shown in MW (1 GW = 1,000 MW).
Updated:
Subjects and places
Subject proposals
- Science and technologySuggested
- Preserved editorial category/topic; broad candidate onlywww.pib.gov.in ↗
Geographic references
Only source-provided geographic references are shown. Opening an external map is optional. Optional story maps use OpenStreetMap. Opening a map sends your IP address and this site’s address to the map provider; location data remains readable as text without loading the map.
- India · Place role: Coverage · Place type: Country or area · Location precision: RegionalEvidence
- Explicit preserved editorial country/region; no city or national centroid inferredwww.pib.gov.in ↗