Technology / WORLD

Correction: unverified report on SMART transoceanic monitoring cable deployment

The original report is withdrawn pending verification. At a workshop held on 23–24 January 2025, the joint task force reported that a 21-kilometre InSEA wet demonstration cable had been deployed off Italy in December 2023 and was providing real-time data from temperature, pressure and seismic sensors. The report described Atlantic CAM as a planned project at that time. These records do not establish the alleged commercial transoceanic launch or the stated warning-time benefit.

Reading sizeSources ↓Share story ↗
Conceptual illustration of technology, processors and connected information.Illustration
Symbolic illustration

Newsverum withdraws pending verification its report that the ITU, WMO and UNESCO-IOC task force activated a first commercial transoceanic SMART cable and demonstrated tsunami warnings minutes faster on 3 November 2026. The source address cited by the original report returned HTTP 404 on 11 November 2026; that alone does not establish whether an event occurred.

At a workshop held on 23–24 January 2025, the joint task force reported that a 21-kilometre InSEA wet demonstration cable had been deployed off Italy in December 2023 and was providing real-time data from temperature, pressure and seismic sensors. The report described Atlantic CAM as a planned project at that time. These records do not establish the alleged commercial transoceanic launch or the stated warning-time benefit.

Primary sources reviewed: https://www.itu.int/en/ITU-T/Workshops-and-Seminars/2025/0123/Documents/Workshop_report_Final.pdf ; https://www.itu.int/en/ITU-T/climatechange/task-force-sc/Pages/default.aspx

Data

Timeline

SMART Cables task force holds 10th workshop

At a workshop held on 23–24 January 2025, the joint task force reported that a 21-kilometre InSEA wet demonstration cable had been deployed off Italy in December 2023 and was providing real-time data from temperature, pressure and seismic sensors. The report described Atlantic CAM as a planned project at that time. These records do not establish the alleged commercial transoceanic launch or the stated warning-time benefit.

  1. · Occurred

    SMART Cables task force holds 10th workshop

    At a workshop held on 23–24 January 2025, the joint task force reported that a 21-kilometre InSEA wet demonstration cable had been deployed off Italy in December 2023 and was providing real-time data from temperature, pressure and seismic sensors. The report described Atlantic CAM as a planned project at that time. These records do not establish the alleged commercial transoceanic launch or the stated warning-time benefit.

Methodology

The linked primary source documents this event. The earlier unverified claim and original event fields remain in the revision history; the original source reference is retained for provenance.

Updated:

Structured coverage

Subjects and places

Subject proposals

Taxonomy version: IPTC Media Topics 2026-Q2

Background

Continue reading

Technology

Correction: unverified report on 2026 transoceanic cable monitoring network

The original report is withdrawn pending verification. On 10 July 2026 the International Advisory Body on Submarine Cable Resilience approved its final report, ITU said. The body, formed by ITU and the International Cable Protection Committee in 2024, recommended work on repair, risk monitoring and route diversity. Recommendations do not establish deployment of the alleged acoustic network, automatic rerouting or universal permits.

Unverified historical Newsverum source reference (former attribution: Official International Telecommunication Union Telecommunication Development Bureau Media Office)2 min read Data included
Technology

Correction: unverified report on joint W3C–C2PA synthetic-media watermark standard

The original report is withdrawn pending verification. The C2PA version 2.4 PDF is dated 1 April 2026; its version history gives April 2026. The specification describes signed provenance manifests and optional soft bindings such as watermarks or fingerprints. Validating a manifest does not establish that its content is truthful. The document does not establish the reported joint W3C–C2PA agreement or guaranteed resistance to editing.

Unverified historical Newsverum source reference (former attribution: Official World Wide Web Consortium and C2PA Steering Committee Media Office)2 min read Data included
Technology

Correction: unverified report on ratified post-quantum DID v2.0

The original report is withdrawn pending verification. On 3 November 2026 W3C published a Candidate Recommendation Draft for DID Resolution v1, describing how to obtain a DID document and metadata. It is work in progress, not a final Recommendation; W3C published a revised draft on 10 November. DID v1.0 became a W3C Recommendation on 19 July 2022. These records do not establish the reported DID v2.0 post-quantum ratification.

Unverified historical Newsverum source reference (former attribution: Official World Wide Web Consortium Decentralized Identifier Working Group Media Office)2 min read Data included