Correction: unverified report on SMART transoceanic monitoring cable deployment
The original report is withdrawn pending verification. At a workshop held on 23–24 January 2025, the joint task force reported that a 21-kilometre InSEA wet demonstration cable had been deployed off Italy in December 2023 and was providing real-time data from temperature, pressure and seismic sensors. The report described Atlantic CAM as a planned project at that time. These records do not establish the alleged commercial transoceanic launch or the stated warning-time benefit.
Event / data period:
Published: · Updated:

Newsverum withdraws pending verification its report that the ITU, WMO and UNESCO-IOC task force activated a first commercial transoceanic SMART cable and demonstrated tsunami warnings minutes faster on 3 November 2026. The source address cited by the original report returned HTTP 404 on 11 November 2026; that alone does not establish whether an event occurred.
At a workshop held on 23–24 January 2025, the joint task force reported that a 21-kilometre InSEA wet demonstration cable had been deployed off Italy in December 2023 and was providing real-time data from temperature, pressure and seismic sensors. The report described Atlantic CAM as a planned project at that time. These records do not establish the alleged commercial transoceanic launch or the stated warning-time benefit.
Primary sources reviewed: https://www.itu.int/en/ITU-T/Workshops-and-Seminars/2025/0123/Documents/Workshop_report_Final.pdf ; https://www.itu.int/en/ITU-T/climatechange/task-force-sc/Pages/default.aspx
Data
SMART Cables task force holds 10th workshop
At a workshop held on 23–24 January 2025, the joint task force reported that a 21-kilometre InSEA wet demonstration cable had been deployed off Italy in December 2023 and was providing real-time data from temperature, pressure and seismic sensors. The report described Atlantic CAM as a planned project at that time. These records do not establish the alleged commercial transoceanic launch or the stated warning-time benefit.
- · Occurred
SMART Cables task force holds 10th workshop
At a workshop held on 23–24 January 2025, the joint task force reported that a 21-kilometre InSEA wet demonstration cable had been deployed off Italy in December 2023 and was providing real-time data from temperature, pressure and seismic sensors. The report described Atlantic CAM as a planned project at that time. These records do not establish the alleged commercial transoceanic launch or the stated warning-time benefit.
Methodology
The linked primary source documents this event. The earlier unverified claim and original event fields remain in the revision history; the original source reference is retained for provenance.
Updated:
- https://newsverum.com/sources/reports/global-infrastructure-itu-submarine-cable-smart-environmental-monitoring-sensors-2026-11-03
- https://www.itu.int/en/ITU-T/Workshops-and-Seminars/2025/0123/Documents/Workshop_report_Final.pdf
- https://www.itu.int/en/ITU-T/climatechange/task-force-sc/Pages/default.aspx
Subjects and places
Subject proposals
- Science and technologySuggested
- Preserved editorial category/topic; broad candidate onlynewsverum.com ↗www.itu.int ↗www.itu.int ↗