Business / WORLD

Gladiator mobilizes fifth rig as drilling starts at Whitehorse Copper

Gladiator Metals said it began an expanded drilling program at the Best Chance and Grafter prospects in its Yukon Whitehorse Copper project. A fifth drill rig was mobilized.

Reading sizeSources ↓Share story ↗
Conceptual illustration of industry, engineering and logistics connections.Illustration
Symbolic illustration

Drilling began at Best Chance, which the company places with Grafter along a 2-kilometre Arctic Chief trend. The expanded program is intended to test known near-surface copper intersections and define the system.

Some grades in the release come from earlier drilling. For example, 15.94 metres at 3.19% copper in BCH-024 and 46.27 metres at 1.00% copper in BCH-023 were identified as historical results, not new assays.

Data

Key figures

Project measurement

Number of drill rigs reported at Whitehorse Copper
5 count
2026-10-20 · Observed
Methodology

Project-level figure reported by issuer; not a national production statistic.

Updated:

Structured coverage

Subjects and places

Subject proposals

Geographic references

Only source-provided geographic references are shown. Opening an external map is optional. Optional story maps use OpenStreetMap. Opening a map sends your IP address and this site’s address to the map provider; location data remains readable as text without loading the map.

  • Canada · Place role: Coverage · Place type: Country or area · Location precision: Regional
    Evidence
Taxonomy version: IPTC Media Topics 2026-Q2

Continue reading

Business

Metals Creek mobilizes for four drill holes at Ogden gold project

Metals Creek said a rig is being mobilized for additional drilling at the Ogden project near Timmins. The planned program comprises four diamond holes targeting the Thomas Ogden Zone fold structure.

Metals Creek Resources via Newsfile Corp.1 min read Data included
Business

Getty Copper expands fall drilling beyond 20,000 metres

Getty Copper said it expanded its drilling program beyond 20,000 metres after Getty South results in British Columbia; two rigs are operating.

Getty Copper Inc. (Newsfile Corp.)1 min read Data included
Business

McFarlane outlines planned 50,000-metre Phase 2 drilling at Juby

McFarlane said it plans 50,000 metres of drilling over 12–15 months at its Juby gold project in Ontario and that the program is fully funded. It expects three rigs to be operating before November 1.

McFarlane Lake Mining via GlobeNewswire1 min read Data included