Infrastructure / WORLD

ADIF formalizes ballast supply for rail renewals in Galicia

ADIF formalized ballast supply and transport for renewals on the Guillarei–Redondela and Redondela–Vigo sections and the Redondela–bifurcación Arcade route. The notice appeared on 20 October.

Reading sizeSources ↓Share story ↗
Conceptual illustration of transport, bridges and infrastructure connections.Illustration
Symbolic illustration

The procurement was divided into two lots. The notice reports a selected offer of €969,360 for Lot 1; it does not state a selected-offer amount for Lot 2.

The decision for Lot 1 was dated 14 September; three bids were submitted, all from SMEs. Formalization does not mean the material has been delivered or the tracks renewed.

Data

Table

Source and amount

Amount reported in the BOE contract notice.

Selected ballast supply offer for Lot 1969360
Methodology

Amount is only the selected Lot 1 offer reported in the source; no Lot 2 amount is given.

Updated:

Structured coverage

Subjects and places

Subject proposals

Geographic references

Only source-provided geographic references are shown. Opening an external map is optional. Optional story maps use OpenStreetMap. Opening a map sends your IP address and this site’s address to the map provider; location data remains readable as text without loading the map.

  • Spain · Place role: Coverage · Place type: Country or area · Location precision: Regional
    Evidence
    • Explicit preserved editorial country/region; no city or national centroid inferredwww.boe.es ↗
Taxonomy version: IPTC Media Topics 2026-Q2

Continue reading

Infrastructure

Spain formalizes Northwest road-safety inspection contract

Spain’s roads directorate formalized the Northwest lot of a multi-lot contract for principal safety inspections on the State Highway Network. The notice was published in the BOE on 20 October.

Boletín Oficial del Estado (BOE)1 min read Data included