Explore reporting through maps, indicators and downloadable source data. Each dataset identifies its scope, methodology and update time. (Page 27 of 411)
Compare only matching units, periods, scope and basis.
The numeric downloads select observed values by default. Forecasts and targets remain separately identified; a few indicators do not constitute an adequate forecasting history.
Computational forestry researchers at the Thompson Rivers University Institute for Wildfire Science in Kamloops deployed an AI forecasting platform on 3 November 2026 calculating forest fuel moisture at 10-meter resolution across British Columbia.
Thompson Rivers University4 min read Data included
Materials science engineers at the University of British Columbia inaugurated a $28 million dry-room pilot facility in Vancouver on 3 November 2026 to fabricate lithium-metal solid-state battery cells with 70 percent higher volumetric energy density.
BC Hydro commissioned a $420 million, 230-kilovolt underground substation 25 meters beneath Nelson Park in downtown Vancouver on 3 November 2026, adding 300 megavolt-amperes of seismic-resilient grid capacity.
Provincial negotiators and Ktunaxa, Secwépemc, and Syilx Okanagan leaders finalized domestic benefit-sharing protocols in Castlegar on 3 November 2026 under the modernized Columbia River Treaty, securing $2.6 billion in hydropower benefits over 20 years.
FortisBC and the City of Kelowna commissioned Phase 3 of the downtown Kelowna district energy network on 3 November 2026, extracting thermal energy from 30 million liters of daily treated municipal effluent across a two-kilometer underground loop.
Commissioning engineers at the $40 billion LNG Canada export terminal in Kitimat introduced hydrocarbon refrigerants into Liquefaction Train 1 on 3 November 2026, cooling cryogenic heat exchangers to minus 162 degrees Celsius.
The Capital Regional District and FortisBC commissioned a biomethane upgrading facility at Hartland Landfill in Saanich on 3 November 2026, refining 2,000 cubic meters of landfill gas per hour to inject 450,000 gigajoules of renewable natural gas annually.
The Nature Conservancy of Canada and Environment Canada secured permanent legal protection on 3 November 2026 for 800 hectares of marshes and riparian cottonwood forests in the upper Columbia River Valley near Golden, shielding over 250 migratory bird species.
Nature Conservancy of Canada4 min read Data included
Viticulture researchers at the Summerland Research and Development Centre concluded two-year trials on 3 November 2026 testing hybrid French-American grape rootstocks capable of surviving minus 30 degree Celsius winter freezes across Okanagan vineyards.
Agriculture and Agri-Food Canada4 min read Data included
G3 Canada and the BC Ministry of Agriculture commissioned a $65 million, 42,000-tonne high-speed grain elevator and continuous rail loop near Fort St. John on 3 November 2026, loading 150-car unit trains in under eight hours.
Natural Resources Canada and Ontario Power Generation finalized the 300-megawatt high-voltage transmission interconnection for the BWRX-300 small modular reactor at the Darlington New Nuclear site on 3 November 2026.
Environment and Climate Change Canada and the Mushkegowuk Council commissioned 12 solar-powered eddy covariance greenhouse gas flux towers on 3 November 2026 across the Hudson Bay Lowlands peatland complex.
Environment and Climate Change Canada4 min read Data included