NEWSVERUM / Global briefing

Data desk · Page 23 of 411

4,927 stories

Explore reporting through maps, indicators and downloadable source data. Each dataset identifies its scope, methodology and update time. (Page 23 of 411)

Compare only matching units, periods, scope and basis.

The numeric downloads select observed values by default. Forecasts and targets remain separately identified; a few indicators do not constitute an adequate forecasting history.

Data desk

Browse subjects

View all subjects ↗
Infrastructure

Correction: unverified report on Calgary Green Line downtown underground construction

The original report is withdrawn pending verification. On 22 September 2026 Calgary council approved an at-grade downtown Green Line alignment along 10 Avenue South, according to the city. The approved downtown segment does not include a tunnel; the city says detailed design and procurement must precede downtown construction. The separate southeast segment began construction in 2025.

Unverified historical source reference (former attribution: City of Calgary Newsroom)2 min read Data included
Government

Correction: unverified report on Newfoundland and Labrador offshore-wind legislation

The original report is withdrawn pending verification. On 2 June 2025 the provincial government announced that legislation enabling offshore renewable-energy development had entered into force. It said federal Bill C-49 passed in October 2024 and the province’s corresponding Bill 90 passed in March 2025. This earlier measure does not establish the reported new November 2026 act.

Unverified historical source reference (former attribution: House of Assembly of Newfoundland and Labrador Hansard)2 min read Data included
Infrastructure

Correction: unverified report on Montréal eastern transit tunnel contract

The original report is withdrawn pending verification. On 31 May 2024 the regional transport authority ARTM presented a proposal for a 38-kilometre surface tramway in eastern Montréal. It described a proposal subject to a Québec government decision, not a completed tunnel contract. This earlier report does not establish the alleged 2026 award.

Unverified historical source reference (former attribution: Autorité régionale de transport métropolitain Communiqué)2 min read Data included
Energy

Correction: unverified report on Point Lepreau molten-salt reactor clearance

The original report is withdrawn pending verification. On 30 June 2023 NB Power submitted an application to prepare a site for the separate ARC-100 project at Point Lepreau. The Canadian nuclear regulator’s project page, last modified on 26 January 2026 and checked on 11 November, describes the application as under review and the provincial environmental assessment as ongoing. Later decisions require separate verification; an application is not a licence.

Unverified historical source reference (former attribution: NB Power Media Centre)2 min read Data included
Infrastructure

Prince Rupert Port Authority opens 400-acre Ridley Island Export Logistics Platform

The Prince Rupert Port Authority and Metlakatla Development Corporation commissioned Phase 1 of the $750 million, 400-acre Ridley Island Export Logistics Platform on 3 November 2026 with 10 kilometers of unit-train loop tracks connected to Fairview Terminal.

Prince Rupert Port Authority4 min read Data included